Loading...
ST8601-CS 910523DATE: TO: FROM: The following project. COPPELL PUBLIC WORKS ~E~O~ND~ Larry Davis, Construction Inspector Howard Pafford, Water Ut Deficient Punchlist Ite.~.MacArthur Blv~ items remain deficien~r~ih~above referenced I) Station 5+18.36 - The guard rail should be removed from its existing location due to it being in direct conflict with the sanitary sewer manhole. 2) The 12" water line under the Denton Creek Bridge should be insulated. However, the representatives with Carter and Burgess have repeatedly stated that the line has been installed properly and should sustain cold temperatures. Therefore in leu of insulating the line, I feel that a two (2) year maintenance bond covering that section of the water line installation will suffice. It is also necessary .for the project engineer to submit a letter stating that the line has been properly installed and why he feels that insulating the line is not necessary. I expect each of these items to be corrected as stated above prior to the final acceptance of this project. HLP/mp cc: Steven G. Goram, Director of Public Works MACARPL . HLP