Loading...
Gibbs Station 2-CS 930723 (2)Suly 23, 1993 P,O. Box 478 Coppell, Texas 75019 214-462-0022 Mr. Bill Anderson Dowdey Anderson & Associates, Inc. 16250 Dallas Parkway Suite 100 Dallas, TX 75248 RE: Gibbs Station Phase H Development Fee Assessment Dear Mr. Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the development fee calculations for Gibbs Station Phase II. Please provide a check made payable to the City of Coppell in the amount of $144,512.59 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee assessment list. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify payment of the required fees and assure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, KennethM.~fi'ffin, City Engineer Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMENT FEES Date: Project: July 23, 1993 Gibbs Station Phase H TOTAL AMOUNT DUE PRIOR TO COUNCIL Water Impact Fee $ 83,200.00 $ 83,200.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 12,400.00 $ -0- (100% due at Issuance of Building Permit) Wastewater Impact Fee $ 27,675.00 $ 27,675.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $ 12,300.00 $ -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee $ 6,150.00 $ -0- (100% due at Issuance of Building Permit) Water Meter Fee (Lots) $ 2,736.75 $ -0- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation) $ 157.00 $ -0- (100% due at Issuance of Building Permit Irrigation Meter Deposit $ 35.00 $ 35.00 (100% due prior to issuance of Water Meters) Water Meter Deposit $ 3,690.00 $ -0- (100% due at Issuance of Building Permit) Street Sign Fee $ 1,034.40 $ 1,034.40 (100% due prior to Acceptance of Project) Street Light Fee $ * $ (100 % due prior to Acceptance of Project) Park Fee $ 43,050.00 $ 21,525.00 (50% due prior to Council Approval) (50% due prior to Issuance of Building Permit) Construction Inspection Fee (2% of Project Cost due prior to Preconstruction Meeting) Total $12,077.59 $204,505.74 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $12,07759 $144,512.59 $144,512.59 +2% inspection fee * See attached memo COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: The following proj e ct: July 22, 1993 Doug Stevens, Engineering Technician Public Works Department Development Fees for Gibbs Station Phase II fees should be assessed on the above referenced Water Impact Fee: 123 - %" x ~" 1 - 1~" Domestic Meter/s = 123 ESU's Irrigation Meter/s = 5 ESU's Total 128 ESU's ~ $650.00 ea = $83,200.00 100% due prior to Council approval of final plat. Wastewater Impact 123 - %" x %" Total 123 100% due prior to Council approval Residential meters = 123 ESU's ESU's ~ $225.00 ea = $ 27,675.00 of the final plat. Water Tap Inspection Fee 124 Connections ~ $100.00 each = $ 12.400.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 123 Connections ~ $100.00 each = S12.300.00 100% due prior to issuance of building permit. DEVELOPMENT FEES Page 2 UtilityFinal Inspection Fee 123 lots ~ S50.O0/lot = S6.150.00 100% due prior issuance of building permit. Water Meter Fee (Lots) 123 - ~" x ~" Residential Meters @ $22.25 ea 100% due prior to issuance of building permit. = $2,736.75 Water Meter Fee (Irrigation) 1 - 1%" Irrigation Meter @ $157.00 ea Total 100% due prior to issuance of water meters. = $157.00 = $157.00 Water Meter Deposit Residential - 123 meters @ $30.00 ea = $3,690.00 lO0% due prior to issuance of building permit. Irrigation Meter Deposit 1 1%" meters @ $35.00 ea = $35.00 Total = $35.00 100% due prior to issuance of water meters. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted, $292.60 per light will be assessed. Development Fees Page $ Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Park Fee Residential Lots ~ $150.00 ea = $ Units (Multi-family) ~ $75.00 ea = $ For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined; 123 Residential Lots @ $350.00 ea = $43,050.00 Units (Multi-family) at $350.00 ea = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Development Fees Page 4 STREET SIGN ASSESSMENT for Gibbs Station Phase II The following assessment is being made in accordance with the city of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $53.10 speed Limit 63.54 10 Yield 58.56 Stop 65.12 Street Name 11.60 ~ Stop & Street Combo 96.85 4 OTHER No Outlet 11.60 1 $635.40 387.40 11.60 TOTAL $1,034.40 Cost breakdowns may be obtained from Public Works by written request. HLP/dm cc: Steven G. Goram Director of Public Works FEES.GIBBSII.HLP