TC Bank-CS041012COP?ELL
October 12, 2004
John Blacker, P.E.
Kimley-Horn and Associates, Inc.
2301 Eagle Parkway, Suite 185
Fort Worth, TX 76177
RE: Lot I, Blk C - Natches Trace Addition
Fee Assessment Letter
Dear Mr. Blacker:
Enclosed is a cop5' of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City of CoppelI in the amount of $5.612.81 and fom, ard
to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of
the assessed fees that need to bc paid prior to filing of the final plat. Please note that the Texas
Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the
issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office
so the 2% & 4% construction inspection fee can be ~erified. The construction inspection fees must be
paid prior to the scheduled pre-construction meeting.
The additional fees for water and sewer taps, water meters, arid utility inspection fees need to be paid by
separate check at the new' Public Works Service Center, 816 S. Coppell Road. Meters will be ordered
when those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this proj ecl. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincer,elv,
Keith R. Marvin, P.E.
Civil Engineer
CCi
Jennifer Am~strong, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
~Jl~ enn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
Project:
Date:
DEVELOPMENT FEE TABLE
Lot 1, Bile C - iN}ttcbes Trace Addition
10/12/2004
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $4,480.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $211.72
(100% due at Issuance of Water Meter)
Water Meter Fee (IrrigationYFireline) $211.72
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $2,240.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $5,612.81 $ 5,612.81
(100% due prior to Council Approval)
Street Light Fee [ntormation not Available
(100% due prior to Acceptance of Project')
Street Sign Fee [ntbrmation not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction) I[
TOTAL $13,016.25
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $5,612.81
DEVELOPMENT FEE WORKSHEET
PROJECT: Lot 1, Blk C- Natches Trace Addition
DATE: 10/12/2004
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 -2 inch = 8 ESU's
1 - 2 inch 8 ESU's
0 = 0 ESU's
0 = 0 ESU's
Total #: 16 ESU's @ $28000 ea
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $211.72
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $211 72
Total #: 0 Additional Irrigation Meter(s) @ $000
Total #: 0 Fireline Meter(s) @ $000
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $3000 ea
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $3000 ea
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 8
(Due prior to issuance of building permit)
$28000 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $5000 ea
(100% due prior to issuance of building permit)
UtiliB' Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea
(100% due prior to issuance of building permit)
$4,48000
$100 00
$211.72
$211~72
$000
$000
$3OOO
$3000
$2,240.00
$50 00
$5000
Park Fee (For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved:
After October 26, 1993
0
0
Single-family @ $0 00 per lot
Multi-family @ $000 per unit
(100% paid prior to Council approval of final plat)
$0.00
$000
$5,61281
Information not Available
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way
This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed development
Once the plans are submitted, $29260 per light will be assessed
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way
(See attached fee calculations if applicable)
Information not Available
Construction
Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the ~mprovements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Lot 1, BII( C- iYatches Trace Addition
DATE: 10/12/2004
ROADWAY IMPACT FEE:
Service Area * 2
Category ** Commercial
Land Use ** Bank
Building Area (sf) 8,867
Development Units ** 8.87
Vehicle Miles per Development Unit ** 2.11
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Ve ~ c e M es per De'~elopment Unit) x (Fee per Vehicle Mile)= $5,612.81
* (Figure 2 - Roadway hnpact Fee Stud.',')
** (Table 3 - Roadway hnpact Fee Stud.,,')
*** (Schedule 2, Page 3 - Roadway hnpact Fee Study)
] AMOUNTDUE: i$5i612'8t I
DEVELOPMENT FEES
PROJECT NAME: Town Center Bank (Natches Trace, Lot 1 Block c)
ENGINEER: Kimley-Horn
ORIGINATION DATE: 10/12/2004
SENT
10/12/2004
ASSESSMENT
Water Impact Fee
Wastewater Impact Fee
Park Fee
Roadway Impact-Zone
Street Sign
Street Light
Construction Inspection
EG or Bore Permit
Overtime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/Irrig)
Utility Final Inspection
~ilSubtotal to Eng.
ASSESSED FEE
$4,48O.OO
$2,240.00
n/a
$5,612.81
$100.00
$50.00
$211.72
$211.72
$30.00
$30.00
$50.00
$5,612.81
AMOUNT PAlE DATE
$0.00 $5,612.81
TOTALS
Total Fees
$13,016.25
Fees Paid Amount Owed
$0.00 $1 3,016.25
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.
DEVELOPMENT FEES
PROJECT NAME:
ENGINEER:
IORIGINATION DATE:
Town Center Bank (Natches Trace, Lot 1 Block C)
Kimley-Horn
10/12/2004
SENT
10/12/2004
12/14/2004
ASSESSMENT ASSESSED FEE
Water Impact Fee $4,480.00
Wastewater Impact Fee $2,240.00
Park Fee n/a
Roadway Impact-Zone $5,612.81
Street Sign
Street Light
Construction Inspection $1,766.06
EG or Bore Permit
Overtime Inspection
Water Tap Inspection $100.00
Wastewater Tap Inspection $50.00
Water Meter (Domestic) $211.72
Water Meter (Fire/Irrig) $211.72
Meter Deposit (Domestic) $30.00
Meter Deposit (Fire/Irrig) $30.00
Utility Final Inspection $50.00
AMOUNT PAlE DATE
$5,612.81 rb 11/16/2004
$1,766.06 rb 12/14/2004
$100.00 mc 6/24/2005
$50.00 mc 6/24/2005
$211.72 mc 6/24/2005
$211.72 mc 6/24/2005
$30.00 mc 6/24/2005
$30.00 mc 6/24~2005
$50.00 mc 6/24/2005
Subtotal to Eng. $7,378.87 $7,378.87 $0.00
Total Fees Fees Paid Amount Owed
TOTALS $14,782.31 $8,062.31 $6,720.00
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
NOTES
Date Received
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Erosion Control Maint.