Loading...
TC Bank-CS041012COP?ELL October 12, 2004 John Blacker, P.E. Kimley-Horn and Associates, Inc. 2301 Eagle Parkway, Suite 185 Fort Worth, TX 76177 RE: Lot I, Blk C - Natches Trace Addition Fee Assessment Letter Dear Mr. Blacker: Enclosed is a cop5' of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of CoppelI in the amount of $5.612.81 and fom, ard to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to bc paid prior to filing of the final plat. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be ~erified. The construction inspection fees must be paid prior to the scheduled pre-construction meeting. The additional fees for water and sewer taps, water meters, arid utility inspection fees need to be paid by separate check at the new' Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this proj ecl. We look forward to working with you on this project. If you have any questions, please contact me. Sincer,elv, Keith R. Marvin, P.E. Civil Engineer CCi Jennifer Am~strong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections ~Jl~ enn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation Project: Date: DEVELOPMENT FEE TABLE Lot 1, Bile C - iN}ttcbes Trace Addition 10/12/2004 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,480.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $211.72 (100% due at Issuance of Water Meter) Water Meter Fee (IrrigationYFireline) $211.72 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,240.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $5,612.81 $ 5,612.81 (100% due prior to Council Approval) Street Light Fee [ntormation not Available (100% due prior to Acceptance of Project') Street Sign Fee [ntbrmation not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) I[ TOTAL $13,016.25 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $5,612.81 DEVELOPMENT FEE WORKSHEET PROJECT: Lot 1, Blk C- Natches Trace Addition DATE: 10/12/2004 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 -2 inch = 8 ESU's 1 - 2 inch 8 ESU's 0 = 0 ESU's 0 = 0 ESU's Total #: 16 ESU's @ $28000 ea (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $211.72 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $211 72 Total #: 0 Additional Irrigation Meter(s) @ $000 Total #: 0 Fireline Meter(s) @ $000 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $3000 ea (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $3000 ea (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 8 (Due prior to issuance of building permit) $28000 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $5000 ea (100% due prior to issuance of building permit) UtiliB' Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea (100% due prior to issuance of building permit) $4,48000 $100 00 $211.72 $211~72 $000 $000 $3OOO $3000 $2,240.00 $50 00 $5000 Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 0 0 Single-family @ $0 00 per lot Multi-family @ $000 per unit (100% paid prior to Council approval of final plat) $0.00 $000 $5,61281 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed development Once the plans are submitted, $29260 per light will be assessed (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the ~mprovements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Lot 1, BII( C- iYatches Trace Addition DATE: 10/12/2004 ROADWAY IMPACT FEE: Service Area * 2 Category ** Commercial Land Use ** Bank Building Area (sf) 8,867 Development Units ** 8.87 Vehicle Miles per Development Unit ** 2.11 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Ve ~ c e M es per De'~elopment Unit) x (Fee per Vehicle Mile)= $5,612.81 * (Figure 2 - Roadway hnpact Fee Stud.',') ** (Table 3 - Roadway hnpact Fee Stud.,,') *** (Schedule 2, Page 3 - Roadway hnpact Fee Study) ] AMOUNTDUE: i$5i612'8t I DEVELOPMENT FEES PROJECT NAME: Town Center Bank (Natches Trace, Lot 1 Block c) ENGINEER: Kimley-Horn ORIGINATION DATE: 10/12/2004 SENT 10/12/2004 ASSESSMENT Water Impact Fee Wastewater Impact Fee Park Fee Roadway Impact-Zone Street Sign Street Light Construction Inspection EG or Bore Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection ~ilSubtotal to Eng. ASSESSED FEE $4,48O.OO $2,240.00 n/a $5,612.81 $100.00 $50.00 $211.72 $211.72 $30.00 $30.00 $50.00 $5,612.81 AMOUNT PAlE DATE $0.00 $5,612.81 TOTALS Total Fees $13,016.25 Fees Paid Amount Owed $0.00 $1 3,016.25 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. DEVELOPMENT FEES PROJECT NAME: ENGINEER: IORIGINATION DATE: Town Center Bank (Natches Trace, Lot 1 Block C) Kimley-Horn 10/12/2004 SENT 10/12/2004 12/14/2004 ASSESSMENT ASSESSED FEE Water Impact Fee $4,480.00 Wastewater Impact Fee $2,240.00 Park Fee n/a Roadway Impact-Zone $5,612.81 Street Sign Street Light Construction Inspection $1,766.06 EG or Bore Permit Overtime Inspection Water Tap Inspection $100.00 Wastewater Tap Inspection $50.00 Water Meter (Domestic) $211.72 Water Meter (Fire/Irrig) $211.72 Meter Deposit (Domestic) $30.00 Meter Deposit (Fire/Irrig) $30.00 Utility Final Inspection $50.00 AMOUNT PAlE DATE $5,612.81 rb 11/16/2004 $1,766.06 rb 12/14/2004 $100.00 mc 6/24/2005 $50.00 mc 6/24/2005 $211.72 mc 6/24/2005 $211.72 mc 6/24/2005 $30.00 mc 6/24/2005 $30.00 mc 6/24~2005 $50.00 mc 6/24/2005 Subtotal to Eng. $7,378.87 $7,378.87 $0.00 Total Fees Fees Paid Amount Owed TOTALS $14,782.31 $8,062.31 $6,720.00 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.