Loading...
Minyard-CS 960419The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 April 19, 1996 Washington and Associates Jacky Flultt 500 Grapevine Hwy., Ste. 376 Hurst, TX 76054 RE: Minyards Expansion at Freeport and Bethel Development Fee Assessment Dear Mr. Fluitt: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee calculations for Minvards ex~an.~ion at Free~ort ami Bethel. As per Section 3 of the 1988 "Contract in Respect of Grant of Easements and Escrow Deposit" between Minyards and the City of Coppell, a credit of $109,203.18 has been applied to the fee assessments for the referenced project. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified We look forward to working with you on this project. If you have any questions, plea~ do not hesitate to contact me. Sincerely, Assistant City Manager/City Engineer Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Oreg Jones, Chief Building Official CITY OF COPPELL DEVELOPMENT FEE SUMMARY SHEET Minyards Expansion at Freeport ~nd Bethel Date: July 23, 1996 TOTAL AMOUNT DUE FEES D~ PRIOR TO COUNCIL APPROVAL Water Impact * 15,9'/5.00 -0- Water Tap Inspection * 100.00 -O- Water Meter (Domestic) * 1,575.00 -O- Water Meter (Irrigation & Fire) * 3,833.18 -O- Water Meter Deposit (Non-residential) * 30.00 -O- Irrigation Meter Deposit * 70.00 -O- Wastewater Impact * 11,250.00 -O- Wastewater Tap Inspection * -0- 4)- Utility Final Inspection * 50.00 -0- Park · -0- -O- Roadway Impact 76,320.00 -O- Street Light -0- -0- (Fee ~ $292.60 per light. Cannot be assessed until TU Electric submits the lighting plan) Street Sign * -0- -O- Construction Inspection need submittal of -0- (2% of project cost due for private improvements) contracts (4% of project cost due for public improvements) TOTAL $109,203.18 · * -0= TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * See Development Fee Work Sheet or Resolution No. 010996.3 of the Code of Ordinances to detei,,lne payment due date~ for individual fees. ** Credit of $109,203.18 per section 3 of the 1988 'Contract in Respect of Grant of Ea~ments and Escrow Deposit" between Minyards nnd the City of Coppell. DEV~.IOPMI~NT FEE WOItg $1Ig~ Water Impact: Domestic Meters # I 4' (inch) -- ~ ESU's Irrigation Meters tt I 2..(inch) = ~ ESU's Fireline Meters # I ~0 (inch) - 2, g' ESU's Total # ~[. ~" ESU's @ $450.00 ca (100% due prior to Council approval of the ~ plat) Water Tap Total # 9.. Connections @ $50.00 ca (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter (Domestic): Total # I q- .(inch) Domestic Meters @ t ~;'~ $. ooea (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Orrigation/Fireline): Total # ca Total # I - ! 0 .(inch) Fircline Meters 0 $1o'~'7,20 ca Totsl$ 5~3.1~ (100% due prior to issuance of water meters) Water Meter Depozit (Multi-family or Non-residential): Total # I Meters @ $30.00 ca (100% due prior to issuance of water meters) IrrigationfFire Meter DepoMt: Total # 2. Meters @ $35.00 ca (100% due prior to issuance of water meters) Wastewater Impact: Total Domestic Meters ESU's - '~, 5' @ $450.00 ca (100% due prior to Council approval of the final plat) Wastewater Tap Inspection: Total # 0 Connections @ $50.00 ca (100% due prior to issuance of building permit) Utility Final Inspection (all devdopment): Total # ~ Lots @ $50.00 ea (I00% due prior to issuance of building permit) = I ~9'9 B'.~o = t $. oo = I 19,5'0 .o0 = 0 Page 1 of 2 DEVELOP~ FEE WORK Date: · Pelimlnary plat approval prior to June 23, 1992: Residential lots @ $150.00 ea Units (multi-family) @ $75.00 ca ($0% paid prior to Council approval of final plat) (50% paid at issuance of building permit) · l)FPIimin~l~ plat approval after June 23, 1992: Residential lots @ $350.00 ca Units (multi-family) O $350.00 ca (50% paid prior to Council approval of fmal plat) (50% paid at issuance of building permit) · Preliminary plat approval after October 26, 1993: Residential lots @ $1,285.00 ca Units (multi-family) ~ $1,285.00 ca (100% paid prior to Council approval of final plat) Roadway Impact: Separate fee calculatiom attached. Street Lighting: Fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of project) Street Signs: Separate Street Sign Assessment form will be provided. (100% due prior to final acceptance of project) Construction Inspection: Copy of contract must be submitted for assessment (2% of project cost due for private improvements) (4% of project cost due for public improvements) Page 2 of 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Minyards Expansion (Frcepon O Bcthal) 7/23/96 ROADWAY EMPACT FF~: Service Area * Category ** Industrial [~rd Use ** General Light Industrial Buil,i!n~ Size (Sq. Ft.) 240,000 Development Units ** 240 Vehicle Miles p~r Development Unit ** 1.06 Fee per Vchicl~ Mile $300 Roadway Impact Fee due - (D~el~ Units) x [Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = * (Figure 2 - Roadway Im.n~t Fee Study) ** (Table 3 - Roadway Impact Fee Study) $76,320.00