ST8601-CS 901004DATE
VIA:
FRO~
RE-'
COPPEI.~ PIIBI..IC ~ORK8
Director of Public Works
October 4, 1990
Steven G. Goram,
M. Shohre~and, ~cting City Engineer~
Larry D~, Construction Inspector /~
MacArthur North Extension - Inspe~on__ Fee
(Tickler 10/1/90) ~
The calculated construction cost for street construction and storm
drainage system on the above referenced project is $1,465,139.50,
based on the contract documents supplied by the engineering firm of
Carter and Burgess. The construction permit fee at 1.5% of
$1,465,139.50 would be $21,977.00.
The contract document construction time is based on 195 days from
the issuance of the letter to proceed. The approximate
construction inspection cost, for 195 days at an average of 3 hours
per day spent on the job site, would be estimated as listed below:
Inspection time
Vehicle expenses
Benefits
Plan review
Estimated inspection cost
$ 7,800.00
600.00
2,400.00
3,500.00
$14,300.00
If I can be of further assistance, please let me know.