MEMO~DUM
October 1, 1990
Steven G. Goram, Director of Public Works
Shohre Daneshmand, Acting City Engineer ~ ~. _
Larry Da '~ ~onstruction Inspector
MacArthur North Extension - Inspection Fee
(Tickler 10/1/90)
The above referenced project calculated construction cost for
street construction and storm drainage is $1,465,139.50, based on
the contract documents supplied by the Engineering firm of Carter-
Burgess. The construction permit fee of 1.5% of $1,465,139.50
would be $21,977.00.
The construction time stipulated in the contract is 195 days from
issuance of the letter to proceed. Based on the 195 construction
day allowance, the construction inspection cost from September of
1990 to March 1991 would be approximately $11,000.00
If I can be of further assistance, please let me know.
Thank you.
CLD/bd