Loading...
ST9301A-CS 980514 DALLAS COUNTY PUBLIC WORKS May 14, 1998 Mr. Ken Griffin, P.E. City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Sandy Lake Project 91-838 (Coppell City Limits to Carrollton City Limits) Transmittal of Pre-Construction Meeting Notes Dear Mr. Griffin: Enclosed are meeting notes from the Pre-Construction Meeting held May 11, 1998 for your records and use. We are sorry your city was not represented. All parties expressed a desire to keep the public informed of project progress. If you have any questions, please advise. Sincerely, · Mears, P.E. Project Engineer jcn ~¢~ file:coppre.trn 411 Elm Street, 4t~ Floor Dallas, Texas 75202 (214) 653-7151 PRECONSTRUCTION CONFERENCE MEETING NOTES SANDY LAKE ROAD PROJECT 91-838 May 11, 1998 A. WORK ORDER DATE: The goal is for May, 1998. What date is mutually agreeable? It was mutually agreed that a Work Order Date would be set for Monday, May 18, 1998 on the condition that the Field Office is operable. B. UTILITIES: ALL REPORTED TO BE CLEAR EXCEPT GTE. ANY COMMENTS OR USEFUL INFORMATION TO BE ADDED BY THE FOLLOWING.9 1. Lone Star Gas: 2. TU Electric: a. One pole is clear but close (10'+/-) to 66" storm sewer outfall with deep cut. There was discussion of possibly sliding the pipe over some. This would be accomplished by a field change. Forrest also pointed out that there is come exposed conduit near the building on the knoll which comes off of the new pipeline which is not on the plans. He believes it is electrical conduit. 3. GTE: a. Previous correspondence from GTE had indicated that underground cable and aerial line to Bait Shop would be clear by April. To date, facilities are still not clear. Bill Shelby reports that all underground facilities are clear. There remains an adjustment on an aerial line. Bill had been told that there was a ROW issue to resolve. Also, he pointed out that there is a metering circuit which is fed from Carrollton which may have to be removed or rolled to Coppell. Richard Barina of DWU will coordinate with GTE. Bill said that once the ROW issue is resolved, it will take 2-3 weeks to move the aerial. Alberta mentioned that Dallas County ROW is clear in that area. John Meat's requested that GTE and DWU be present at the first field meeting and everyone look at the conflict on the ground. Bill was told that when removing the Manhole he needs to provide 95% compaction. 4. Cable: 5. Dallas Water Utilities: Richard said regarding the 36" pipeline to be relocated he needs a weeks notice. 6. City Water and Sanitary Sewer: Everyone was reminded that this is a Dallas County administered project and all instructions to Contractor will be directed to and through Dallas County personnel. 7. Emergency and routine utility contacts: All utility companies are requested to provide the name and phone number for personnel as well as telephone numbers for which the appropriate persons can be reached during non-working hours emergencies and on weekends. GTE = Bill Shelby DWU = Richard Barina 8. UTILITY COMPANIES MAY BE EXCUSED AT THIS TIME: C. CONTRACT ADMINISTRATION: 1. Status of executing the contract: Two fully executed contracts delivered to Rosbel Ramos. 2. Have all paperwork items indicated in correspondence dated February 24, 1998 been accomplished? (Review items) 3. Insurance Certificate: Must be kept current. 4. EPA "NOTICE OF INTENT"; status of getting the paperwork submitted: ALSO REMINDER ABOUT ANY SUBCONTRACTORS WHO MUST ALSO CERTIFY UNDERSTANDING OF THE PLAN. 5. Discussion of estimate procedures and reminder about required monthly form the contractor must provide. Janet Norman explained the monthly estimate processing procedures. PD-7 certificate due on Friday and payment can be picked up after 3 P.M. two weeks later (Friday). She also advised that holidays will have an adverse effect on that schedule. D. CITY PARTICIPATION: The Cities of Coppell and Carrollton have committed substantial financial and personnel resources to the successful completion of this project from its inception. The CRies will, through Dallas County's field representatives, inspect work relating City facilities. However, all orders, instructions and approvals to the contractor must and will come through Dallas County. PRECONSTRUCTION CONFERENCE PROJECT 91-838 Page Two E. CONSTRUCTION: 1. SUGGESTED CONSTRUCTION SEQUENCING: Does contractor anticipate a need to request something different than what is indicated in the plans? Peter Sturdivant delivered two copies of the project schedule. 2. TRAFFIC CONTROL OFFICER: Contractor's designated individual to immediately handle any correction, change or adjustment is? Forrest Scott. John said that no traffic control plan submittal was required. Eddie Ramos expressed concern that some phases of the construction overlap. They may need to drain the lake as soon as possible. 3. MAINTENANCE OF TRAFFIC AND ACCESS TO RESIDENCES: Sandy Lake Road and access to all properties must remain open at all times. Exceptions to this will be considered only upon written requests. Written requests must and will be handled through Dallas County. In no instance, however, will the safety and convenience of the public be sacrificed for the convenience of the Contractor. John especially wants staff to maintain contact with the bait shop owner. Forrest said that he had already been in contact. 4. JOB SUPERINTENDENT: It should be emphasized that the project superintendent must be a full time employee of Ramex Construction Co., Inc. and be available on the project as well as being capable and if necessary to have the authority to carry out appropriate directives from Dallas County promptly. Forrest Scott 5. SPECIAL PROVISION TO ITEM 100: Contractor is reminded of the requirements of this special provision which indicates the contractor's responsibility to identify vertical and horizontal location of underground utilities that may be in conflict. Included in Preparation of Right of Way. 6. MATERIAL TESTING: Any discussion relative to scheduling of testing services, contractor's cost for PRECONSTRUCTION CONFERENCE PROJECT 91-838 Page Three overtime, scheduling procedures, etc. County schedules all testing. Alberta Robinson expressed the desire to go to Commissioners Court this week with the testing contract. Forrest asked if the bedding material was tested and the reply was no. Peter asked if Dallas County required certifications from suppliers and John said no. Eddie asked if TEAM would have a full time person on the job. Answer: no. Dallas County will try to give TEAM 24 hours notice. TEAM is asked to be present at the pre-paving conference. Eddie asked if not having a testing contract would affect Pioneer's testing prior to mix design. This is the Contractor's responsibility. Pioneer is ready to do trial batches. John said for them to go ahead as soon as possible. 7. TRENCH SAFETY: Reminder about the precautions, inspections and paperwork required in special specification 4010. Ramex needs to submit a plan signed (sealed) by an engineer. 8. FIELD OFFICE: Status of acquisition and installation. Ramex expects to get power this week. The phone was promised on 5/12 but they still have to run lines from Stemmons. Peter asked if they should block long distance on the phone. James Walsh requested that they not block long distance. Dallas County personnel have procedures in place to pay for long distance calls which are only made in emergency. Forrest believes that the field office will be operational by the middle of next week. 9. BULLETIN BOARD: To be used to display required Workers Compensation information. May also be used for posting Partnering Mission Statement, EPA notice of intent, etc. Status/schedule for installation: 10. PROJECT SIGNS' Status/schedule for installation: Project signs will be in place by the end of the week. PRECONSTRUCTION CONFERENCE PROJECT 91-838 Page Four 11. WEEKLY PROGRESS CONFERENCES: Weekly Progress Meetings, Tuesdays at 1:00 p.m., at the jobsite will be conducted by the Dallas County's Project Engineer. Representatives of the Cities of Coppell and Carrollton are requested to participate. Field representatives of Dallas County Public Works Department and of Ramex Construction Co., Inc. are required to participate weekly. 12. PARK CONSTRUCTION: Any discussion relative to construction elements or schedule of park construction. Bob Schantz said that the transformer is still there. Forrest said that the finished plans show the transformer on an island in the parking lot. Bob said that he knows some trees will have to go to tree heaven. He will get with Ramex on the event scheduling. G. PARTNERING: 1. Partnering will be renewed, at least monthly. 2. Partnering report cards will be discussed monthly, twice monthly at beginning of project. H. PUBLIC NOTIFICATIONS: 1. Copy of courtesy letter to adjacent property owners attached for comment. 2. Talk to property owners regularly. John stressed that Contractor and County personnel talk to everyone and let the know what is happening on the project. I. COMPLAINTS: 1. Number one rule in complaint management: Don't get them in the first place. 2. Number two rule in complaint management: If you do get them follow through of complaint/incident investigation and action is necessary. 3. Number three rule in complaint management: Do not assume someone else is taking care of it. PRECONSTRUCTION CONFERENCE PROJECT 91-838 Page Five 4. Copy of complaint form attached for comment. 5. Please provide John Mears with copy of completed form after the complaint is handled. K. CORPS PERMIT: 1. Are Corps Permit provisions understood? 2. A compliance report must be submitted each October 1 by Dallas County. 3. Does a meeting need to be set up with a Corps representative? Eddie asked if there was any paper work required for them to drill the piers. John said that we have to demonstrate that we are complying with the permit. The COE does not have to pre-approve as long as we comply. Alberta said that if the Contractor desired a variance from the Ozone Action Day, it would be considered on a "single instance" basis with regard to the impact on the travelling public. Forrest had a question regarding an easement. Lance Charriere had a question regarding a traffic signal foundation which is indicated in the specifications but not shown on the plans. Also, there was a question regarding a lighting panel in the parking lot. Bob said that as there was a building by the parking lot he would rather that the wiring go to the building rather than have another panel outside. Meeting notes prepared by Janet Norman. 91-838:'d~d~tlng no~s DALLAS COUNTY Department of Public Works SANDY LAKE ROAD PROJECT 91-838 PRE-CONSTRUCTION MEETING Monday, May 11, 1998