Loading...
Northlake BC-CS02122612x26x2~2 16:02 CITY OF COPPELL ENGR. DEPT. ~ SRU CTR N0.216 COPPELL ~.0. Bt= F~: ~JZ'A3OA-a~o ENGINEERING DEP,,qRTMENT FAX COVER SHEET (Inc, lu~ng oow' =hoer) 0 Urgent OPo~ RevJow 0 Iqoaso CommoM ~ Please Repay J~' YOU DO I~IOT REC, F.J~ ~ OF THE PAGES PZ.Ed~ C.M.J. (§72) $04-$679 12x2B/2~2 16:02 CITY OF COPPELL ENGR. DEPT. e SRU CTR N0.216 DEVELOP/~ENT FEE5 tiG]PROJEO' NAME: NEER: G~NA'TION DATE: SENT 4130/01 2% & 4% ~/30/01 Park Fee Waler Im~-t Fee Wastewatar ]repot Fee Street Sign street Ugl~t Construction Inspection R~dwaV Impact-Z~ne Street Cut Pem~lt Overtime Inspection Water Tap Inspe~tiee Wastewater Tap Inspection Water Melmr (Domestic) Water Meter (Pim/Inig) Meter Deposit (Dorllestlc) Meter Del~i~ (Rre/Irri9) Utility FIr~l TOTAL~ Northiake Business Center (Parking Addil~n) ASSE~ED FEE AMOUNT PAAO $1,125.00 $1,125.00 notify street dept. $3,144.00 $3,1,VI.00 $$0.00 $50.00 when meters, ~ps or deposits are paid $62.74 $62,74 $30.00 $30,00 Total Fees Fees Paid $4,411.74 $4,41L7~ NOTES Prate Received s/2/oi s/2/oi 5/2/m 5/7./01 Amount $0.00 DATE Prior To Final Aoceptimce As Built Plan Recd. Paving Bond Recd. UUlitle; Bo~d Recd. Erosion Control Plaint. 12726x2~2 16:02 CiTY OF COPPELL ENGR. DEPT. ~ SRU CTR N0.216 QB4 12/26x2~2 16:02 CITY OF COPPELL ENGR. DEPT. ~ SRU CTR N0.216 Q03 CITY OF COPPELL Prepared by ~ JOURNAL ENTRY App,oved by,, POSTED BY:__ FUND= DATE ~,,5--=~ ! DATE: J.E. NO ...... DESCR;PTiON ACCOUNT DR. CK NUMBER