Loading...
Northlake BC-CS010430DEVELOPMENT FEES PROJECT NAME: Northlake Business Center (Parking Addition) ENGINEER: ORIGINATION DATE: 4/30/01 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID Park Fee 4/30/01 Water Impact Fee $1,125.00 $1,125.00 Wastewater Impact Fee Street Sign Street Light Construction inspection Roadway Impact-Zone Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS 2% & 4% $3,144.00 4/30/01 4/30/01 4/30/01 notify street dept. $3,144.00 $50.00 $50.00 $62.74 $62.74 $30.00 $30.00 Total Fees Fees Paid $4,411.74 $4,411.74 DATE 5/2/01 5/2/01 5/2/01 5/2/01 5/2/01 Amount Owed $o.oo Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.