ST8601-CS 890320DANNENBAUM ENGINEERING CORPORATION
March 20, 1989
Mr. Dan Dowdey, P.E.
Roberts and Dowdey
16200 Dallas Parkway
Suite 200
Dallas, Texas 75248
RE: MacArthur Blvd.
City of Coppell
Extension
Dear Mr. Dowdey:
On March 13, 1282 I met with you and Mr. Glen Hinckley to discuss the
preliminary construction plans which Oannenbaum Engineering Corporation has
prepared for the proposed MacArthur Blvd. extension in northern Coppell. At
the meeting we discussed the additional median openings, left turn lanes and
street turnouts which you believe are needed to provide access to adjacent
properties. You requested that these facilities be included in the current
construction plans. We have reviewed your request and believe that certain
modifications are needed as shown on the attached drawing. These
modifications will not adversely affect the intent of your proposed
facilities. If you agree with our modifications we propose to revise the
construction plans to include the additional facilities. However, prior to
making the revisions, we request that you provide confirmation from the City
of Coppell that the additional facilities are acceptable to the City.
If we can be of further assistance in this matter, please call.
Sincerely,
D~~ERING CORPOP~ATION
Phil Deaton, P.E.
Project Manager
PD:ck:O00
2201-01
cc: Mr. Glen Hinckley Mr. Tom Tanner
Mr. Jeff Hurt