Loading...
ST8601-CS 880303OPPELL PUBLIC WORK March 3, TO: FROM: RE: 1988 Steven M. Morton, Richard MEMORANDUM Chief of Land Developmen~ Diano, Park Foreman'~ MacArthur @ Beltline Median Irrigation I have reviewed the irrigation and landscaping plans for Valley Ranch/MacArthur Blvd. North. The following provisions will need to be met prior to the installation of this system. ° Ail connections to utilities must be made north of the bridge within the City of Coppell. A controller must be placed in median area, as well as a · water meter/double check. o Abandon any connections existing to utilities attached to the bridge. Manual bleed on valves requested to drain valves for winter- ization. Prefer all pipe be same schedule. Ail fittings be schedule 40. RED/bb cc: Steve Goram, Director of Public Works Bobby Harrell, Chief Financial Office, Terra Co.