ST8601-CS 880303OPPELL PUBLIC WORK
March 3,
TO:
FROM:
RE:
1988
Steven M. Morton,
Richard
MEMORANDUM
Chief of Land Developmen~
Diano, Park Foreman'~
MacArthur @ Beltline Median Irrigation
I have reviewed the irrigation and landscaping plans for Valley
Ranch/MacArthur Blvd. North. The following provisions will
need to be met prior to the installation of this system.
° Ail connections to utilities must be made north of the bridge
within the City of Coppell.
A controller must be placed in median area, as well as a
· water meter/double check.
o Abandon any connections existing to utilities attached to
the bridge.
Manual bleed on valves requested to drain valves for winter-
ization.
Prefer all pipe be same schedule. Ail fittings be schedule
40.
RED/bb
cc: Steve Goram, Director of Public Works
Bobby Harrell, Chief Financial Office,
Terra Co.