ST8601-CS 880331March 31,
TO:
FROM:
RE:
1988
Taryon Bowman,
COPPELL
PUBLIC WORKS
MEMORANDUM
P & Z Coordinator
Steven M. Morton, Chief of Land Development'*~
Pre-preliminary MacArthur Blvd. Extension North
Taryon, as per our conversation, it is my understanding that this
item has not been scheduled for DRC review as of March 4, 1988.
At this time, Public Works has some questions that will need to
be addressed by the City Engineer and/or Dannenbaum Eng..
UTILITY - 1) Is the 12" water main sufficient size for future
development?
2) Why is sanitary sewer not being extended?
STREETS - 1)
2)
3)
Median nose for existing MacArthur Blvd. needs to
be tapered, not squared.
needs to
Median nose for proposed MacArthur Blvd.
be built.
Taper pavement @ Sta. 215+17.77 is short.
PARKS
1) Need a conceptual irrigation layout for medians.
2) Need a conceptual landscaping layout for medians.
SMM/bb
cc: Steve Goram
Richard Diano
Per Birdsall
Howard Pafford