Loading...
ST8601-CS 880331March 31, TO: FROM: RE: 1988 Taryon Bowman, COPPELL PUBLIC WORKS MEMORANDUM P & Z Coordinator Steven M. Morton, Chief of Land Development'*~ Pre-preliminary MacArthur Blvd. Extension North Taryon, as per our conversation, it is my understanding that this item has not been scheduled for DRC review as of March 4, 1988. At this time, Public Works has some questions that will need to be addressed by the City Engineer and/or Dannenbaum Eng.. UTILITY - 1) Is the 12" water main sufficient size for future development? 2) Why is sanitary sewer not being extended? STREETS - 1) 2) 3) Median nose for existing MacArthur Blvd. needs to be tapered, not squared. needs to Median nose for proposed MacArthur Blvd. be built. Taper pavement @ Sta. 215+17.77 is short. PARKS 1) Need a conceptual irrigation layout for medians. 2) Need a conceptual landscaping layout for medians. SMM/bb cc: Steve Goram Richard Diano Per Birdsall Howard Pafford