Loading...
ST8601-CS 880204DANNENBAUM ENGINEERING CORPORATION February 4, 1988 City of Coppell 255 Parkway Blvd. P.O. Box 478 Coppell, Texas 75019 Attn: Ms. Taryon Bowman Zoning Coordinator Dear Ms. Bowman: We herewith submit five (5) sets of preliminary plans for the extension of MacArthur Boulevard from the DeForest Road intersection north across Denton Creek to match the existing MacArthur Boulevard in the Vista Ridge Development. South of Denton Creek, the preliminary plat reflects the right-of-way as determined by Ginn, Inc. We understand that acquisition of this land by the City of Coppell is currently underway. Please note that additional slope easements and temporary construction easements will be required. The right-of-way north of the creek owned by Vista Mortgage & Realty, Inc., will be dedicated during the platting process. We are also submitting a preliminary bridge layout for the Denton Creek bridge, a proposed six-lane structure. In addition, we have furnished details for architectural treatment consistent with the existing bridge structure at the north end of the project. Your review and comments regarding this proposed thoroughfare improvement are greatly appreciated. We are available to meet with you, at your convenience, to discuss this project. Very truly yours, DANNEN! UM ENGINEERING CORPORATION Phil Deaton, P.E. Project Manager PD;BSR;kn:OSO8PD 2201-32 Enclosure