Loading...
PA9702-LR 990721 (3)CONCRETE COMPREbSIVE STRENGTH TES'I' 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/06/1999 Report No.: 9918319 Report Date 07/21/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 750 19 Coppell, Texas/Prj. #96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: 6 Sack CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 07/06/1999 BATCH TB~E: 10:20am PLANT: N/A Tml:~ SANn'LED: 11:05 am BY: Batty Cuble SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sunny, mild STRENGTH: 3000 psi @ 28 Days TENn'ERATURE (F) - Atn 86 F CONCRETE: 90 SLUMP: 3-5" TRUCK NO: 209 TICKET NO: 74525 AIR: ]X]'/A AIR CON~NT (%): N/A UNIT WEIGHT (pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Grade beams: Lines D.4 to F/0.5, 0.5 to 7.7/F, F to D.4/7.7 ASTM C-172 ASTM C-39 SAMPLE LOCATION: F J7.7 REPORT OF TESTS Acctn~.rt,A~vE VAMPS: 30 CYLINDER MEASURED MAXIMUM COMPRESSlYE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.25 07/13/1999 7 106910 3780 1 2 5.25 07/13/1999 7 104780 3710 Average 3750 1 3 5.25 08/03/1999 28 1 4 5.25 08/03/1999 28 Samples taken at point of discharge. Technician: Barry Cuble Started: 9:00am Finished: 12:00pro I"BC Report Distribution: (1) City of Coppell (1) City of Coppelt - Engineering (1) B rinkley Sargent Architects (1) City of Coppell - Bldg. Insp. Eugene H~rbour ( 1 ) Turner Engineers ( 1 ) City of Coppell - Leisure Serv Dept Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1