May 23, 2001
Christian Schnitger
Schrickle, Rollins and Associates, Inc.
1161 Coq0orate Drive West
Suite 200
Arlington, TX 76006
RE: MacArthur Park PA 00-01
Final Acceptance of Paving and Utilities
Dear Christian:
A final inspection of paving and utilities for the referenced project has been confirmed by
representatives from the Engineering Depa~u,ent of the City of Coppell. All other areas of the
project will be inspected for completion by the other departments involved.
The two-year maintenance bonds have been received from the contractor. Maturity on the bonds
will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be
two years from the date of this letter.
Please forward as-built drawings for this project to the Engineering Department.
Cofl~tructio~ Inspector
cc: Susan Lee Wright, Schrickle, Rollins and Assoc.
Kelly Mayfield, Dean Electric, Inc.
Ken Griffin, D~rector of Engineering/Public Works
Rhonda Brothers, Engineering Secretary
Glenn Hollowell, Asst. Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal