Loading...
Magnolia Park-CS010523c-OI:sPEt L May 23, 2001 Christian Schnitger Schrickle, Rollins and Associates, Inc. 1161 Coq0orate Drive West Suite 200 Arlington, TX 76006 RE: MacArthur Park PA 00-01 Final Acceptance of Paving and Utilities Dear Christian: A final inspection of paving and utilities for the referenced project has been confirmed by representatives from the Engineering Depa~u,ent of the City of Coppell. All other areas of the project will be inspected for completion by the other departments involved. The two-year maintenance bonds have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Please forward as-built drawings for this project to the Engineering Department. Cofl~tructio~ Inspector cc: Susan Lee Wright, Schrickle, Rollins and Assoc. Kelly Mayfield, Dean Electric, Inc. Ken Griffin, D~rector of Engineering/Public Works Rhonda Brothers, Engineering Secretary Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal