Loading...
Magnolia Park-CS 990112COPPELL STREETS DIVISION DATE: January 12, TO: Larry Davis, FROM: Brent Adams, RE: 1999 Construction Inspector Streets Division Walk-thru Magnolia Park 1/12/99 Listed below are Street Division comments relative to 1. Pavers need sand and lock up with roller. walk thru. Note: Dirt being allowed to fill between pavers because above Was not done to begin with. Approach to Denton Tap not sealed. Random cracks as marked. 'B# - Backfill and compact. · ~' - Drainage-headwall undermined/eroded; water; finish around headwalls. inlet holding 'D-l" - inlets and pipes silted in (1/2 north - grade and erosion protection. Seal BFR to curb laydown. full); headwall to the Note: See attached.