Loading...
Northlake 635(2)-CS001211 T H £ · C I T Y · 0 F c0-15i5EE£ December 11, 2000 Randy Eastep Metro Lawn Care, Inc. 40 l0 Lawreunion Dallas, TX 75212 RE: Replat of Lot 1, Block A, Northlake 635 Business Park (Lincoln Business Park) Fee Assessment Letter for Additional 2" Irrigation Meter Dear Mr Eastep: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $3,600 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees. The additional fees, $269.37, needs to be paid by separate check at the Public Works Service Center, 732 Deforest. The irrigation meter will be provided when these fees are paid. Sincerely, Assistant City Engineer Jennifer Armstrong, Finance Director Debbie Ingram, Secretary Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Replat of Lot 1, Block A, Northlka¢ 635 Business Park (Lincoln Business Park) Additional 2" Irrigation Meter Date: 12/11/00 TOTAL FEES DUE Water Impact Fee $3,600.00 (100% due prior to Council Approval) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $189.37 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project Street Sign Fee Information not Available (100% due prior to Acceptance of Project Construction Inspection Fee Information not Available TOTAL $3,869.37 DEVELOPMENT FEE WORKSHEET -o. ROJECT: DATE: Replat of Lot I, Block A, Northlkae 635 Business Park (Lincoln Business Park) Additional 2" Irrigation Meter 12/11/00 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 0 = 0 ESU's 1 - 2 inch = 8 ESU's ~, 0 = 0 ESU's 0 = 0 ESU's Total #: 8 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) $3,600.00 $50.00 $0.00 $189.37 $0.00 $0.00 $0.00 $30.00 $0.00 $0.00 $0.00 Water Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) ,'igation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $189.37 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $35.00 ea, (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total 0: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: @ $450.00 ea, Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) /-ttility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. Page 1 Ex, 12"Wtr. ESMT. 2" DOMESTIC SERVI( .~.644'25'37"1 17.9~ OFFICE / WAREHOUSE BLDG. C FF--521.5 -~,TBcMu T SET ON INSTALL: 1-12"x8" TAPPING SLEEVE 1-8" VALVE DOUBLE E ECTOR C.ECK/VAULT INSTALL: 1-8"x 6" 1-6" VAL~ 1-6" 45' BEND ~-FH A ~ '-- - REFERENCE FIRE SPRINKLER PLANS FOR CONNEC~ON 6" FIRELINEh ESMT. SS MH Rim 17.9.3 N89'3{ SS MH 5'X 5' SAN.Rim SEW. ESMT. 168.,.3; (3) box culverts 5S MH Rim 17,90 FL 06.55 INSTALL: WASTEWATER ACCESS DEVICE Ex. 12"S$ - CONNECT 4-" SERVICE TO EXIST. MANHOLE FL 4"--512.0 N~ DROPS INSIDE C,._MANHOLE Rim 16.82 METRO LAWN CARE, INC, PH. 214-630-8675 4010 LA REUNION DALLAS, TX 75212 PAY \ \ ! O BANKOF ~ .... FoR ,'OD I, t I, i,' J: i, i, t,O &h t E 5"1 1311 ;. DOLLARS [] ~.~'~' ! I