Loading...
Magnolia Park-CS 980504COPPELL, TEXAS 75019 Bill Anderson, P.E. Dowdey, Anderson & Associates, Inc. 5225 Village Creek Dr., Suite 200 Piano, TX 75093 P.O. Box 478 Coppell, Texas 75019 972-462-0022 May 4, 1998 Magnolia Park Development Fee Assessment Dear Mr Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell ia the arno $356,460.00 and forward to the Finance Depa~bxsent along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Depastment will help us to verify the payment of required fees and insure a successful beginning of thi.~ project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Michael A. Martin, P.E. Assistant City Engineer CC' Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Public Works Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DE.ELOPMENTFEE WORKSHE~F PROJECT Magnolia Park DATE: 5/4/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 114 - 5/8 inch X 3/4 inch 114 2 - 2 inch 16 6 - 5/8 inch X 3/4 inch 6 Total #: 136 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 122 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 114 Domestic Meter(s) @ $24.83 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 2 Irrigation Meter(s) @ Total #: 6 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $192.15 $24.83 Water Meter Deposit Fee (Domestic): Total 0: 114 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 8 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ES 114 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 114 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ali developments): Total 0: 114 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $61,200.00 $6,100.00 $2,830.62 $384.30 $148.98 $o.oo $3,990.00 $240.00 $51,300.00 $5,700.00 $5,700.00 Page 1 DE. r2LOPMENT FEE WORKSHE~. ~' Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: 114 N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A $146,490.00 N/A $97,470.00 Information not available at ~ time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 2 VELOPMENT FEE TABLe, Project: Magnolia Park Date: 5/4/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $61,200.00 $61,200.00 (100% due prior to Council Approval) Water Tap Inspection Fee $6,100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $2,830.62 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $533.28 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $3,990.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $240.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $51,300.00 $51,300.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $5,700.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee I[ $5,700.00 (100% due at Issuance of Building Permi0 Park Fee $146,490.00 $146,490.00 (100% due prior to Council Approval) Roadway Impact Fee $97,470.00 $97,470.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Proje~ available at this time Street Sign Fee Information not (100% due prior to Acceptance of Proje~ available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $381,553.90 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $356,460.00 ROAI,, CAY IMPACT FEE CALCULA~ ~ONS PROJECT: Magnolia Park DATE: 5/4/98 ROADWAY IMPACT FEE: ¥ ** 'Building Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Developmem Unit) x (Fee per Vehicle Mile) = 1 Residemial Single-Family Detached N/A 114 2.85 $300 $97,470.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway lm.naet Fee Study) DEVELOPMENT FEES PROJECT NAME: Magnolia Park ENGINEER: Dowdey, Anderson & Associates, Inc. OR G NAT ON DATE: 5/4/98 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE 5/4/98 Park Fee ($146,490.00) *See Notes 5/4/98 Water Impact Fee $61,200.00 $61,200.00 5/28/98 5/10/02 Water Impact Fee $280.00 $280.00 di 5/10/02 5/4/98 Wastewater Impact Fee $51,300.00 $51,300.00 5/28/98 9/15/98 Street Sign $1,938.75 $1,938.75 10/2/98 10/1/98 Street Light $9,070.60 $9,070.60 12/2/98 Const. Inspection(grading) $7,715.00 $7,715.00 5/28/97 Const. Inspection (utilities) $33,557.07 $33,887.07 8/28/98 Const. Inspection (paving) $25,297.10 $28,297.10 6/24/98 5/4/98 Roadway Impact-Zone 1 ($97,470.00) 5/16/19rev. Roadway Impact-Zone 1 $91,954.00 $91,954.00 6/22/98 Street Cut Permit 7/13/98 Overtime Inspection (7/11) $210.00 $210.00 2/18/99 7/21/98 Overtime Inspection (7/18) $180.00 $180.00 8/26/98 10/26/98 Overtime Inspection(10/24) $255.00 $255.00 11/6/98 11/2/98 Overtime Inspection(10/31) $120.00 $120.00 11/6/98 12/7/98 Overtime Inspection(12/5) $120.00 $120.00 12/18/98 5/10/02 Meter (irrigation) $24.77 $24.77 di 5/10/02 5/10/02 Meter deposit (irrigation) $30.00 $30.00 di 5/10/02 5/10/02 Utility Final Inspection $50.00 $50.00 di 5/10/02 TOTALS TotalFees Fees Paid Amount Owec $283,302.29 $283,302.29 $0.00 NOTES * For Magnolia Park assessment see City of Coppell; Magnolia Park/Coppell Greens Development Agreement (City Secretary's office) Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved irrigation Plan Recd. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint,