Loading...
Freeport NIP(2.3)-CS 960419 (2)April 19, 1996 WORKS kBox 478 )pell, Texas 75019 -462-0022 Mayse & Associates Mike Mayse 14850 Quorum Drive Suite 20 Dallas, Texas 75240 Development Fee Ass~ment Enclosed is a copy of the City of Coppall Development Fee Assessment list, along with a copy of the Development Fee Calculations for Oulll. Please make payment to the City of Coppell in the amount of $58.671.00 and forward it to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you On this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer Jennifer Armstrong, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Ted Dutt, Interim Utilities Superintendent Per Birdsall, Street Division Rick Wieland, Parks Development Coordinator CITY OF COPPELL DEVE~ OPM~ FEgg Date: April 19, 1996 TOTAL AMOUNT DUE ~DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee I00.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee 3,600.00 3,600.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 195.98 (100% due at Issuance of Water Meter) Water Meter Deposit (Non-Residential) 30.00 (100% due at Issuance of Water Meter Water Meter Fee (Irrigation & Fire) 5,357.78 (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Acceptance of Project) Street Light Fee * information not (100% due prior to Acceptance of Project) available Park Fee (50% due prior to Council Approval) (50% due prior to Issuance of Building Permit) Street Escrow 46,746.00 46,746.00 (100% due prior to Council Approval) Construction Inspection Fee need submittal of (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $64,489.76 $58,671.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * This fee cannot be asaezsed until aRer TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be at~e~ed. COpp~T.n ENGIN~mJENG ~E~ORANDON DATE: TO: 3'ROW: RE: April 10, 1996 Mike Martin, Assistant City Engineer Ted Dutt, Interim Utilities Superintendent Development Fees for 0ui11-440 Royal Lane The following fees referenced project. Water Impact Fee: should be assessed and collected on the above ~ - ~" Domestic Meter/s = ~ ESU's 1 - 2" Irrigation Meter/s = 8 ESU's 2 - 8" Fireline Meter/s = 2.5 ESU's Total 18.5 100% due prior to Council approval ESU's @ $450.00 ea = S8.325.00 of the final plat. Wastewater Impact 1 - ~" Domestic Meter/s = 8 ESU's Total 8 ESU's ~ $450.00 ea = S3.600.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee $ Connections ~ $50.00 each = $i00.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspaction Fee ~ Connections @ $50.00 each = $50.00 100% due prior to issuance of building permit. (RE-INSPECTIONS FOR WATER OR WAST~ATER $30.00) (Residential only) Development Fees Page 2 Utility Final Inspection Fee (All Development) ~ lots @ $ 50.QQ/~ot = $50.~Q 100% due prior to issuance of building permit. Water Meter Fee (Domestic) ~ - 2" Domestic Meters ~ $195.98 = $195.98 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water HeterFee (Irrigation/Fireline) ~ - 2" Irrigation Meter/s @ $ 195.98ea = S195.98 2 - 8" Fireline Meter/s ~ $2o580.90ea = S5.161.80 Total S5.357.78 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential) i Meters @ $$0,00 ea = S30.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters @ $35.00 ea = $35.00 100% due prior to issuance of water meters. devfeea ESCROW ! ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Freeport North, Replat of Lot 3C & a portion of Lot 5R (Quill) 4112196 ROADWAY IMI~ACT FEE: ~erviee Area * Land Use ** Buildim, $iz~ (Sq. Ft.) Development Units ** Vehicle Miles per Develo~meat Unit ** Roadway Impact Fee due = (Development Units) x General I.i~ht Inth~stria1 147,000 147 1.06 $3O0 chicle Miles r Devel ment Unit) x (Fee r Vehicle Mile) = $46,746.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study)