Northlake 635(7)-CS 980803 COPPELL,
TEXAS 75019
Pat Acker, P.E.
Halff Associates
8616 Northwest Plaza Drive
Dallas, TX 75225
Northlnke 635 Business Park, Block B, Lot 2
Development Fee Assessment (Revised)
Dear Mr. Acker:
PO. Box 478
CoppeiL Texas 75019
972-462-0022
August 3, 1998
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $59,815.77 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Depa,'U~cnt will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely ~/~{~f~,t~
~ Martin, P.E.
Assistant City Engineer
CC.'
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
,~gam HoHowell, Assistant Director of Public Work~
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE TABLE
Project: Northlake 635 Business Park, Block B, Lot 2 (Revised)
Date: 8/3/98
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
i Water Impact Fee $8,325.00 $8,325.00
(10055 due prior to Council Approval)
Water Tap Inspection Fee $200.00
(10055 due at Issuance of Water Meter)
Water Meter Fee (Domestic) $192.15
(10055 due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $5,956.65
(10055 due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(10055 due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $90.00
(10055 due at Issuance of Water Meter)
Wastewater Impact Fee $3,600.00 $3,600.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(10055 due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 N/A
(10055 due prior to Council Approval)
Roadway Impact Fee $47,890.77 $47,890.77
(10055 due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need subn~ttal of
development contracts
TOTAL $66,389.57
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $59,815.77
~,EVELOPMENT FEE WORKSt,.-'ET
PROJECT: Northlake 635 Business Park, Block B, Lot 2 (Revised)
DATE: 8/3/98
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
I - 2 inch -- 8 ESU's
1 - 2 inch = 8 ESU's
= ESU's
2 - 8 inch = 2.5 ESU's
Total #: 18.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 4 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $192.15
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigatio~FireUne Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $192.15
Total #: 0 Additional Irrigation Meter(s) @
Total #: 2 Fireline Meter(s) @ $2,882.25
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total 0: 3 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: I Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: I Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$8,325.00
$2q0.00
$192.15
$192.15
$o.oo
$5,764.50
$35.00
$90.00
$3,600.00
$50.00
$50.OO
Page 3
.,.':VELOPMENT FEE WORKSI'.-'ET
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
$47,890.77
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at ~his time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development contracts
Page 4
RO.~)WAY IMPACT FEE CALCUL~ FIONS
PROJECT:
DATE:
Norttdake 635 Business Park, Block B, Lot 2 (Revised)
8/3/98
ROADWAY IMPACT FEE:
]ervice Area * 10
~ategory ** Office
II.,and Use ** General Office Buildin~
Building Size (Sq. Ft.) 80,018
Development Units ** 80.018
Vehicle Miles per Development Unit ** 3.99
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Uni0 x (Fee per Vehicle Mile) = $95,781.55
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
50 % Credit as per approval by City Manager =
$47,890.77