Loading...
Northlake 635(7)-CS 980803 COPPELL, TEXAS 75019 Pat Acker, P.E. Halff Associates 8616 Northwest Plaza Drive Dallas, TX 75225 Northlnke 635 Business Park, Block B, Lot 2 Development Fee Assessment (Revised) Dear Mr. Acker: PO. Box 478 CoppeiL Texas 75019 972-462-0022 August 3, 1998 Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $59,815.77 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Depa,'U~cnt will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely ~/~{~f~,t~ ~ Martin, P.E. Assistant City Engineer CC.' Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician ,~gam HoHowell, Assistant Director of Public Work~ Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Northlake 635 Business Park, Block B, Lot 2 (Revised) Date: 8/3/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL i Water Impact Fee $8,325.00 $8,325.00 (10055 due prior to Council Approval) Water Tap Inspection Fee $200.00 (10055 due at Issuance of Water Meter) Water Meter Fee (Domestic) $192.15 (10055 due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $5,956.65 (10055 due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (10055 due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (10055 due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (10055 due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (10055 due prior to Council Approval) Roadway Impact Fee $47,890.77 $47,890.77 (10055 due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need subn~ttal of development contracts TOTAL $66,389.57 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $59,815.77 ~,EVELOPMENT FEE WORKSt,.-'ET PROJECT: Northlake 635 Business Park, Block B, Lot 2 (Revised) DATE: 8/3/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): I - 2 inch -- 8 ESU's 1 - 2 inch = 8 ESU's = ESU's 2 - 8 inch = 2.5 ESU's Total #: 18.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $192.15 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigatio~FireUne Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $192.15 Total #: 0 Additional Irrigation Meter(s) @ Total #: 2 Fireline Meter(s) @ $2,882.25 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total 0: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: I Lots @ $50.00 ea. (100% due prior to issuance of building permit) $8,325.00 $2q0.00 $192.15 $192.15 $o.oo $5,764.50 $35.00 $90.00 $3,600.00 $50.00 $50.OO Page 3 .,.':VELOPMENT FEE WORKSI'.-'ET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $47,890.77 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at ~his time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 4 RO.~)WAY IMPACT FEE CALCUL~ FIONS PROJECT: DATE: Norttdake 635 Business Park, Block B, Lot 2 (Revised) 8/3/98 ROADWAY IMPACT FEE: ]ervice Area * 10 ~ategory ** Office II.,and Use ** General Office Buildin~ Building Size (Sq. Ft.) 80,018 Development Units ** 80.018 Vehicle Miles per Development Unit ** 3.99 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Uni0 x (Fee per Vehicle Mile) = $95,781.55 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) 50 % Credit as per approval by City Manager = $47,890.77