Loading...
Mobil Sta & 7-11-AG 900313~- v. 4.-24-89 ' * AGENDA REQUEST FORM ,o~,~,v,~, CITY COUNCIL HBE~ING March 13, 1990 ITEM NO. ITEM CAPTION: , Coasideratio~ of aa escrow a~reement for ~Mobil/7-1 ] Joint Venture in lieu of .heir obligation to construct their portion of ~,La,e Road /~.r~,em~ (Dlirecto%:'~ s Signature) OTHER REP.: EVALUATION OF ITF-~: DATE: Februar~ 28, 1990 Mobil Off/7-11 Joint Venture has paid in full $11,900.00 as required for the future public improvement along their frontage mi Sandy Lake Road. This amount was paid as a portion of development fees. Staff recommends approval of this agreement. BUDGET AMT.: AMT. ESTIMATED: AMT. +/- BUDGET: COMMENTS: FINANCIAL REVIEW BY: LEGAL REVIEW BY: AGENDA REQ FORM 0588DS REVIEWED BY CM: CITY OF COPPELL ESCROW AGREEMENT For and in consideration of the mutual covenants and agreements herein contained, the City of Coppell hereinafter called "City" and Mobil/7-11 Joint Venture hereinafter called "Developer", do hereby agree as follows, to wit: WHEREAS, the current City policies (Subdivision Ordinance Appendix A, Section 17) require that in new areas, Developer install major public improvements where required in or adjacent to said addition. Developer had elected to develop Connell/Skaggs Addition, Lot 4, Block A, and Addition in the City of Coppell, Dallas County, Texas (See Exhibit 1, attached). In lieu of developers obligation to construct their portion of Sandy Lake Road imDrovements and 59.50 linear feet of frontaqe still unimproved, the Developer agrees to placed in escrow $11,900.00 for the construction of aforesaid major public improvements. This dollar amount being based on the current pro rata charges as provided for in Appendix B of the Subdivision Ordinance, and is based on a future estimated cost of $200.00 per front foot for Sandy Lake Road. This roadway is classified as a six-lane divided major thoroughfare. The actual amount due to the City will be based on the actual cost when constructed, and the escrow account adjusted accordingly at that time. This escrow will be required in lieu of the construction of a half-street. THEREFORE, the Developer does hereby deposit $11,900.00, which will be held in the sole name of the City in an interest bearing account to draw interest at the current rate. No withdraws shall be made until such time as the above mentioned improvements are made. After completion and acceptance of the above mentioned improvements by the City, the difference between the escrowed funds (original amount escrowed plus the accrued interest) and the actual cost shall be refunded to the Developer. In the event the actual cost of the above mentioned improvement exceed the escrowed funds (original amount escrowed plus the accrued interest) the Developer will be assessed the difference, payable within 10 days of notice. The City may issue Building Permits on the aforesaid property without the requirements of the aforementioned improvements, and upon deposit of Escrow Funds described herein. Signed and Executed this the day of 19 Mob~/7-11 Joint Venture M~_ Oil C~r~oratlon The Southland CQrporation ~e~e.~er City of Coppell By: Mark Wolfe, Mayor Attest: City Secretary Escrow Agreement, Mobil/7_ll/Sandy Lake Road Escrow. MSD February 13, The City With A Beautiful Future 1990 Mr. Mostafa Setayesh, P.E. The Dimension Group, Inc. 3455 Highland Road, Suite 100 Dallas, Texas 75228 P.O. Box 478 Coppell, Texas 75019 214-462-0022 RE: Mobil 0il/7-11 at Sandy Lake Road and Denton Tap Road (Connell/Skaggs Addition, Lot 4) Dear Mr. Setayesh: Attached please find a draft copy of the Escrow Agreement regarding Sandy Lake Road. As we discussed, we are in the process of reviewing said agreement, along with our City Attorney. Please note that staff has checked the final plat files on the above referenced project and attached you will also find a letter from the City to Mr. Koch with Powell &'Powell Engineers, dated June 15, 1987, requesting a fee in the amount of $1451.00. Said fee was paid in the amount of $1448.88 (see attached copy of receipt). Listed below are the fees on the above referenced project: Availability Fee Water Tap Fee Sewer Tap Fee Construction Inspection Fee 1) Initial Deposit 2) 1.5% Construction Estimate (1.5% x $20634.90 as you provided on 12/12/90) ~l~Street Improvement EscrowA. mount Subtotal CURRENT FEES FEES PAID (due on 2/26/90) on 6/19/87 $366.48 $404.00 ~-' $100.00 - $100.00 - $847.00 $309.59 $11,900.00 $12,576.07 $1451.00 Amount Paid Total Amount Due $1448.88 $11,127.19 Page2 of 2 Please forward a check for the amount of $11,087.12 to the Finance Department, City of Coppell, by Monday, February 26, 1990, and send us a copy of the receipt. Please note that we will have the Escrow Agreement item on the same City Council Agenda as your S.U.P. request regarding this project. If you have any questions, please do not hesitate to call me at 462-8495. Sinqe,~ely, ~ ! ~ity Engineer RRD / SMD / bb xc: Taryon Bowman, P & Z Coordinator Larry Davis, Construction Inspector Amy Crowley, Accountant A1 Rogers, Mobil Oil Corporation Mike Irvin, Southland Corporation Attachment MOSTAFA.SMD FILE COPY ,~o,e___~__~.£ __,~ ~?~ 0007344 Received From ~W~'7-r~,~.rn~..~:~ ~'~ _~ Address ~ ~ Dollars $/~7,/ ACCOUNT ~T. PAID CHECK