Northlake 635(9)-CS 9611251996
Future
The City With A Beautiful
P.O. Box 478
Coppell, Texas 75019
214-462-0022
November 25, 1996
James M. Corkili, FAHA/AIA
The Richmond Group
12200 Stemmons Fwy., Suite 207
Dallas, TX 75234
Northlake 635 Business Park, Lot 3, Block C (Marek Brothers Systems, Inc.)
Development Fee Assessment
Dear Mr Corkill:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $14,700.00 and forward to the
Finance Department along with a copy of the Fee Assessment table. This mount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely, ~)
K ,E.
AsSistant Ci~anager/City Engineer
cc:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project: Northlake 635 Business Park, Lot3, Block C (Marek Brothers System, Inc.)
Date: 11/25/96
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $4,500.00 $4,500.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $134.93
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $1,487.38
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $70.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $2,250.00 $2,250.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $7,950.00 $7,950.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
tOTAL $16,672.31
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $14,700.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Northlake 635 Business Park, Lot3, Block C (Marek Brothers System, Inc.)
DATE: 11/25/96
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 - 1 1/2 inch = 5 ESU's
1 - 1 inch = 2.5 ESU's
= ESU's
1 - 6 inch = 2.5 ESU's
Total #: 10 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap ln,pection Fee:
Total #: 3 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter(s) @ $134.93
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter(s) @ $48.30
Total #: 0 Additional Irrigation Meter(s) @
Total #: 1 Fireline Meter(s) @ $1,439.08
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
5
@$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: I Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$4,500.00
$150.00
$134.93
$48.30
$0.00
$1,439.08
$30.00
$70.00
$2,250.00
$50.00
$50.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ t~75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
$7,950.00
Information not
available at Ibis time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development contracts
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Northlake 635 Business Park, Lot 3, Block C (Mardt Brothers Systems, Inc.)
11/25/96
ROADWAY IMPACT FEE:
Scrvice Area *
Category **
Land Use **
Bu~din~ Siz~ (Sq. Ft.)
Development Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
Roadway Impact Fee due = (Development Units) x
10
Industrial
General Light Industrial
25,000
25
1.06
$30O
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $7,950.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
This fee is eligible for up to a 50% credit do to the
original developer constructing Lakeshore & Crestside Drives.
To Receive this credit a letter from the original developer
needs to be submitted assigning some of the credits for
this development,