Loading...
Northlake 635(5)-CS 990621 COPPELL, TEXAS 75019 FO. Box 478 Coppe[L Texas 75019 972-462-0022 June 21, 1999 Todd Abbott, E.I.T. HalffAssociates, Inc. 8616 Northwest Plaza Dr. Dallas, TX 75225-4292 Northlake 635 Business Park, Lot 1 Block D (Coppell Commerce Center) Revised Fee Assessment Letter Dear Mr. Abbott: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $61,012 20 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Please refer to the attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required Ices and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, ~ Martin, P.E. Assistant City Engineer CC; Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of~eisure Services DEVELOPMENT FEE TABLE Project: Northlake 635 Business Park, Lot 1, Block D (Coppell Commerce Ctr.) Date: 6/21/99 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $15,525.00 $15,525.00 (100% due prior to Council Approval) Water Tap Inspection Fee $300.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $384.30 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $6,148.80 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $70.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $120.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $7,200.00 $7,200.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permi0 Utility Final Inspection Fee $100.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $38,287.20 $38,287.20 (100% due prior to Council Approval) Street Light Fee ~orma~on not Available (100% due prior to Acceptance of Project Street Sign Fee ',m~r~a~o~ not Available (100% due prior to Acceptance of Project Construction Inspection Fee ~form~o. not Available TOTAL $68,235.30 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $61,012.20 DEVELOPMENT FEE WORKSHEET PROJECT: Northlake 635 Business Park, Lot 1, Block D (Coppell Commerce Ctr.) DATE: 6/21/99 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 2 - 2 inch -- 16 ESU's 2 - 2 inch = 16 ESU's 0 = 0 ESU's 2 - 8 inch = 2.5 ESU's Total #: 34.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 6 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 2 Domestic Meter(s) @ $192.15 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total 0: 2 Irrigation Meter(s) @ $192.15 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 2 Fireline Meter(s) @ $2,882.25 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 4 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 16 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 2 Connections @ $50.00 et, (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ail developments): Total #: 2 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $15,525.00 $300.00 $384.30 $384.30 $0.00 $5,764.50 $7O.00 $120.00 $7,200,00 $100.00 $100.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: o o Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.00 ' $0.00 $38,287.20 Information not Availabl Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee celculations if applicable) Information not Availabl Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Availabl Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Northlake 635 Business Park, Lot 1, Block D (Coppell Commerce Ctr.) 6/21/99 ROADWAY IMPACT FEE: Warehouse Portion of Development ~rvice Area * 10 ~ategory ** Industrial ~and Use ** Development Units ** General Li~,ht Industrial 99.28 Vehicle Miles per Development Unit ** 1.06 Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $300 $31,571.04 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) ROADWAY IMPACT FEE: Office Portion of Development Service Area * Ca,gory ** Land Use ** Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x ~Vehicle Miles per Development UniO x (Fee per Vehicle Mile) = 10 Office General Office Buildin~ 141.52 1.06 $300 $45,003.36 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Amount of Discount based on 50% Credit $38,287.20