Kimbel Addition-CS 890214February 14, 1989
COPPELL PUBLIC WORKS
MEMORANDUM
TO: Sanford Case, Ginn Inc.
FROM: Per Birdsall, Street Foreman
RE: Kimbell Kourt
I was required to make an inspection of the road Kimbell Kt. recently
due to complaints received. The road's condition, as expected,
has deteriorated rapidly due to the heavy loads experienced during
the continuing construction of the new ground storage facility.
This condition has also been duly noted by the Director of Public
Works.
Please have the Contractor submit his intentions for the repair
of directly affected portions of that road and for street sweeping
of Kimbell Kt., Village Pkwy., and MacArthur Blvd., which have been
tracked with dirt from the construction site. This should be accom-
plished within a reasonable period of time after operations which
have caused these~ situations to occur or when deemed necessary to
prevent loss of life or property.
Thank you for your cooperation in this matter. If you have any
questions, please contact me at 462-8495.
PHB/bb
cc: Steve Goram,
Tom Griffin,
Russell Doyle,
Director of Public Wor~l~
Police Chief
City Engineer