Loading...
Northlake 635(8)-CS 991209COPPELL, TEXAS 75019 P,O. Box 478 Coppell. Texas 75019 972-462-0022 December 9, 1999 Pat Acker, P.E. Halff Associates, Inc. 8616 Northwest Plaza Drive Dallas, TX 75225 RE: Northlake 635 Lot 2R Block D (McCollister's Expansion) Fee Assessment Letter Dear Mr. Acker: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $4,134.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Kent M. Collins, P.E. Civil Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Northlake 635 Lot 2R Block D (McCollister's Expansion) Date: 12/09/1999 TOTAL AMOUNT DUE FEES DUE PRIOR.TO COUNCIL APPROVAL Water Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Water Tap Inspection Fee $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100 % due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 $0.00 (100 % due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $4,134.00 $4,134.00 (100% due prior to Council Approval) ' Street Light Fee Information not Available (100% due prior to Acceptance of Project Street Sign Fee Information not Available (100% due prior to Acceptance of Project Construction Inspection Fee Infornmtion not Available II TOTAL $4,134.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $4,.134.00 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Northlake 635 Lot 2R Block D (McCollistef s Expansion) 12/09/1999 ROADWAY IMPACT FEE: ;ervice Area * 10 Category ** Industrial ! ~nd Use ** Gcae~'al Light Industrial R,,ilding Area (st) 26,000 Development Units ** 26.00 Vehicle Miles per Development Unit ** 1.06 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $8,268.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Percent of Credit Toward Roadway Impact Fees 50% Total Credit $4,134.00