Loading...
Meadows Addn 6-AG 900410,, ITF~ CAPTION: Co~id~r a final southeast con]er of Parkway Bo~deval~ SI.~ BI'FI TTED BY: EVALUATION OF ~: t l~s'man: P&Z Come--tm- CITY OF COPPELL PLAIfl~ING DEPARTMENT STAFF REPORT CASE: MEADOWS ADDITION, SECTION 6, PHASE II, FINAL PLAT P & Z HEARING DATE: March 15, 1990 C. C. HEARING DATE: April 10, 1990 LOCATION: Southeast corner of Parkway Boulevard and Samuel Boulevard REQUEST: Approval of the final plat. SIZE OF AREA: 2.68 acres APPLICANT: Meadowglen Properties 12201 Merit Drive, Suite 170 Dallas, Texas 75251 HISTORY: This parcel is a portion of PD-105, which proposes single-family development TRANSPORTATION: Parkway Boulevard and standard. Samuel Boulevard are developed to ANALYSIS: On March 8, 1988, a preliminary plat was approved by the City Council to allow for construction of 78 single-family lots, and a final plat containing 56 lots, was approved on June 13, 1989. Subject plat contains a total of 13 single-family lots, which are to be constructed in accordance with the provisions established by the Planned Development Case #PD-105. The remaining lots are to be platted in the near future, which w0uld complete Section 6 of the Meadows Addition. ALTEI~ATIVES: 1) Approve the final plat as submitted. 2) Deny the final plat. ATTAClt~NTS: 1) Final Plat MED6STF ITEM 7 Minutes of March 15, 1990 Planning & Zoning CommiSsion Page 3 D AFT Item 7: Following discussion Coeeissioner Redford moved to approve Case #ZC-524. Commissioner Gross seconded the motion; motion carried (6-0) with Chairman Munsch and Commissioners Green, Gross, Redford, Scott and Tannell voting in favor of the motion. PLATTING Consider approval of a final plat for Meadows Addition, Section 6, Phase 2, located at the southeast corner of Parkway Boulevard and Samuel Boulevard, at the request of Meadowglen Properties. P&Z Coordinator Taryon Bowman introduced the item to the Commission. Ms. Bowman stated this plat is actually Phase 2 of the Meadows Addition, or Case #PD-105. If approved, this plat will allow the conetr~ction of thirteen single-family structures on 2.68 acres. She further stated that all DRC come.nra have been addressed; therefore, staff has no objections to the plat. Mr. Glen Hinckley was present to represent this item before the Commission. Re stated that all utilitiea are already in place, and that this property should have been included with the final plat with D.R. Borton's project directly adjacent to this property. Mr. Binckley stated that it was due to an oversight that this property was not included. Following discussion Commissioner Tunnell moved to approve the final plat for the Meadows Addition, Section 6, Phase 2. Commissioner Scott seconded the motion; motion carried (6-0) with Chairman Munsch and Commissioners Green, Gross, Redford, Scott and Tunnell voting in favor of the motion. Item 8: Consider approval of a final plat for Park West Commerce Center Addition (formerly Gateway Park @ Coppell), located at the southwest corner of Southwestern Drive and Beltline Road, at the request of Prentie/Copley Properties. Director of Planning Gary L. Sieb introduced the item to the Commission. Mr. Sieb stated that this is a 328 acre tract, with the preliminary plat already approved. He also stated that staff would recoa~end approval of this final plat, however, he would like to point out that the Public Works Departeent has several concerns, as outlined in their ~emo dated March 14, 1990. Mr. Sieb also stated that the applicant has included a letter dated March 15, 1990, which says that they do agree to follow through with all their construction drawings and everything will be submitted for City approval within ninety (90) days of this plat going to City Council.