ST8502-CS 881027GINN, INC.
CONSULTING ENGINEERS
October 27, 1988
Mr. Russell Doyle, P.E.
City Engineer
City of Coppell
P.O. Box 478
Coppell, Texas 75019
Re: Response to September 22, 1988
Moore Road Bridge.
FEMA the
Dear Mr. Doyle:
As a part of our October 3, 1988, letter regarding the above, we
forwarded a packet of information to you with a Draft response to
FEMA for your signature and subsequent mailing to FEMA. We have
enclosed a copy of the October 3, 1988 letter and its attachments
for your convenience. We have also enclosed two sets of the AS
BUILT plans for Northlake Woodlands East Phase 6 and another
response letter to FEMA on Coppell letterhead for your signature
and transmittal to FEMA. You now have the complete submittal
required to satisfy FEMA's concerns regarding the effects of the
new Moore Road Bridge.
As the Consulting Engineer for the Moore Road Improvements, and
former Floodplain Administrator, I formally request that you sign
the letter to FEMA and mail it and the AS BUILT drawings for both
the Moore Road Bridge and Northlake Woodlands East Phase 6 as
soon as possible in order to put this matter to rest.
Enclosures
cc:
Ron Morrison, P.E.
John C. Karlsruher,
File 254
P.Eo
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900