Loading...
ST8502-CS 881027GINN, INC. CONSULTING ENGINEERS October 27, 1988 Mr. Russell Doyle, P.E. City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Response to September 22, 1988 Moore Road Bridge. FEMA the Dear Mr. Doyle: As a part of our October 3, 1988, letter regarding the above, we forwarded a packet of information to you with a Draft response to FEMA for your signature and subsequent mailing to FEMA. We have enclosed a copy of the October 3, 1988 letter and its attachments for your convenience. We have also enclosed two sets of the AS BUILT plans for Northlake Woodlands East Phase 6 and another response letter to FEMA on Coppell letterhead for your signature and transmittal to FEMA. You now have the complete submittal required to satisfy FEMA's concerns regarding the effects of the new Moore Road Bridge. As the Consulting Engineer for the Moore Road Improvements, and former Floodplain Administrator, I formally request that you sign the letter to FEMA and mail it and the AS BUILT drawings for both the Moore Road Bridge and Northlake Woodlands East Phase 6 as soon as possible in order to put this matter to rest. Enclosures cc: Ron Morrison, P.E. John C. Karlsruher, File 254 P.Eo 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900