ST8502-CS 881003GINN, INC.
October 3, 1988
Mr. Russell Doyle, P.E.
City Engineer
City of Coppell
P.O. Box 478
Coppell, Texas 75019
Re: Response to September 22,
Moore Road Bridge.
1988 FEMA letter regarding~e
Dear Mr. Doyle:
We have reviewed the above mentioned letter with Mr. Ron Morrison
of Kimley-Horn and Associates, Inc., who has already taken steps
to resolve the issues raised by FEMA. The results of Mr.
Morrison's discussion with FEMA are contained in the September
29, 1988 letter from Mr. Morrison to Ginn, Inc. Ail that remains
to be done to satisfy FEMA in this matter is outlined in the
previously mentioned letter, and a Draft letter of response has
been prepared and attached for your use in submitting the
required documentation to FEMA.
Of the documentation which must be submitted with your letter to
FEMA, Ginn, inc. will provide that "as-built" drawings of the
Moore Road Bridge. The Public Works Department has the "as-
built" drawings for Northlake Woodlands East you will need.
If you have any questions regarding the above, please call me.
Sincerel~y,
H. Wayne Glnn, P.E.
enclosures
cc: John C. Karlsruher, P.E.