Loading...
ST8502-CS 881003GINN, INC. October 3, 1988 Mr. Russell Doyle, P.E. City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Response to September 22, Moore Road Bridge. 1988 FEMA letter regarding~e Dear Mr. Doyle: We have reviewed the above mentioned letter with Mr. Ron Morrison of Kimley-Horn and Associates, Inc., who has already taken steps to resolve the issues raised by FEMA. The results of Mr. Morrison's discussion with FEMA are contained in the September 29, 1988 letter from Mr. Morrison to Ginn, Inc. Ail that remains to be done to satisfy FEMA in this matter is outlined in the previously mentioned letter, and a Draft letter of response has been prepared and attached for your use in submitting the required documentation to FEMA. Of the documentation which must be submitted with your letter to FEMA, Ginn, inc. will provide that "as-built" drawings of the Moore Road Bridge. The Public Works Department has the "as- built" drawings for Northlake Woodlands East you will need. If you have any questions regarding the above, please call me. Sincerel~y, H. Wayne Glnn, P.E. enclosures cc: John C. Karlsruher, P.E. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900