ST8502-CS 880728COPPELL PUBLIC ~ORKS July 28, 1988 TO: FROM: RE: Steve Goram, Director of Public Works All items outstanding on the improvement of this roadway have been completed. The items requested by the Parks department were peeling paint on the bridges within the project. After a phone call to the contractor, these items were addressed by removing the peeled paint and repainting. All are complete as of 7/27/88. RED/sm