Loading...
Meadows Addn 6-CS 900222The City With A Beautiful Future February 22, 1990 lifO' P.O. Box 478 ~ ~ Coppell, Texas 75019 214-462-0022 FILl COP? Mr. Bill Anderson Dan M. Dowdey & Associates 16250 Dallas Parkway, Suite 100 Dallas, Texas 75248 Meadow Addition, Section 6, Phase 2 Final Plat Dear Mr. Anderson: We received a blue line print of final plat on the above referenced project. However, as of this date, we have not received the final construction plans for our review and comment. You hadindicated to Shohre Daneshmand of our office that the final construction plans for this phase has been approved as part of Meadows Addition, Section 6, Phase I, and for that reason there would not be a need to submit plans for this phase and that she should check with Steve Goram and myself. She has done that. Please note that since this is a separate final submittal, per the subdivision ordinance and for practical purposes, it is required that you provide related final construction plans for this project. ~.,.,~j~Attached please find a set of check lists from Public Works Department for olc your use /n addition to Coppell s standards and ordinances. Also, you will find a copy of Mr. Howard Pafford's comments for this project, which need to be addressed. Ail appropriate development fees must be paid prior to approval of ~ the final plat by the City Council. Please submit four (4) sets of final construction plans to the Public Works Department by Monday, February 26, 1990. If you have any questions, please contact Shohre Daneshmand or myself at 462- 8495. _//~ ~RRD/MSm/bb xc: Steve Goram, Director of Public Works Taryon Bowman, P & Z Coordinator Glen Hinkley, Univest Properties BILL.MSD BI,': Howard Pafford, Water Utilities SuDerintendent Phone 462-8495 Water/Sanitary Sewer Plans: Please mak~3~the following additions and/or corrections as may ~ 1) - Show existing water/sanitary sewer lines as /~ocated in the area where they exist. 2) ~' Show proposed water/sanitary sewer lines. (minimum sizes are 8") ~o~L~ % ~o~ ~¢~c~ 3) ~ Show proposed placement of va~_~, ~ma~holes, fire hydrant~L~clean out, .~a~r services, and ~ewer services~ - ~ 4) 5) - Show sanitary sewer line profiles as related to existing and finished grade. Show all necessary easements aq~20 ft~ unless the proposed easement is locater's' ' ~/L~ween two lots, then-~m~--f~--~is allowed. If any off site easements are necessary, all documents concerning that easement shall be finalized prior to Council approval of the final plat. 6) 7) - If the development is anything other than peSidential, the building area shall be noted n the plans. er Subdivision Ordinance Section XVI, Item "B", Page 20, the following listed fees must be paid nine (9) working days prior to CC meeting: water and sewer availability. water tap fee. . and sewer tap fee. Page 1/2 8) General Notes: Ail Construction material will conform to the City of Coppell Standard Construction Detail and Subdivision Ordinance. 9) Be Ail construction will conform to the City of Coppell Standard Construction Detail and the North Central Council of Government Standard Specifications for Public Works construction. Additional Notes: Ail residential service lines shall be 1" type "k" copper. B. Ail materials shall be furnished by the Contractor. 10) - See attached requirements on water services. 11) -,;~S'~e attached requirements for "Meter  / Application Standards". 12) Ail above comments must be addressed, prior to staff's recommendation for approval of the final plat and plans. 14) Provide a written response on all with explanations provided on addressed as requested above. No c~ent. comments, items not DRC/COM/~ENTS/WAT/FINAL SD/HP/pd ~e 2/2