Loading...
Meadows Addn 6-CS 890823 PAUL S. UNZICKER, INC. CONSULTING ENGINEERS 8700 STEMMONS FREEWAY, SUITE 400 DALLAS, TEXAS 75247 (214) 634-3300 August 23, 1989 Mr. Tom Wise C.W. Young Construction, 210 South Sixth Mansfield, Texas 76063 Inco Re; Meadows Section Six - Phase One Coppell, Texas 86062 Dear Tom: I am writing this letter to remind you that there are existing utilities located within the Samuel Boulevard Right-of-Way. As seen on the Water and Sanitary Sewer Plan (Sheet 3 of the Engineering Plans for this project) a caution note was added instructing the contractor to contact each of the respective utility companies prior to construction. Please pay special attention to the existing gas main (which Lone Star Gas has staked in the field for your reference) located just West of the East Right-of-Way line of Samuel Boulevard. The actual depth of this gas line is unknown. If you have any questions, please feel free to call Scott Marpe' with Lone Star Gas at (214) 259-2867 or me. Sincerely, Kevin R. K~nd~ick, P.E. Project Manager KRK/bp cc: Larry David - City of Coppell.¥ Gordon Jones - D.T. Construction, Inc. Jeff Hawkins, P.E. - Pierce Lunsford PAUL S. UNZ1CKER, P.E. DAVID M. SCHNURBUSCH, P.E. President Vice President '% August 21, 1989 PIERCE-LUNSFORD ASSOCIATES, lNG. Mr. Chuck Young C. W. Young Construction, 210 S. Sixth Avenue Mansfield, TX 76063 CONSULTING ENGINEEI~S Ref. No. 915362.10 FILE COPY Inc. Subject: Water Line, Sanitary Sewer and Storm Drainage Improveme~ ~ ~bdivisi~-~'Secti ~Coppel~ M.n_n. ~] Coppell, Texas Dear Mr. Young: You are hereby given Notice to Proceed on all utility work as specified in the contract documents for the above subject project. Enclosed are two fully executed bound sets of contract documents. Please forward one copy to your surety. Please check with Mr. Larry Davis at the City of Coppell tO make sure you have satisfied the City's permit requirements prior to placing utilities on site. The working day contract time will begin today. In accordance with the agreement, the work should be substantially complete 30 workinG days from today. If you have any questions about the provisions of the contract, please contact me. Sincerely, PIERCE-LUNSFORD ASSOCIATES, INC. Jeffrey M. Hawkins, P.E. JMH/sh CC-' Mr. Paul Phy Mr. Kevin Kendrick - Paul S. Unzicker Mr. Gordon Jones - D. T. Construction Mr. Larry Davis - City of Coppell Mr. Brad Williams - PLA Mr. Aron Athavaley - Texas Water Commission (Duncanville) 3109 CARLISLE, SUITE 206 3901 W. PIONEER PARKWAY, SUITE 100 DALLAS, TEXAS 75204 ARLINGTON, TEXAS 76013 (214)871 2126 (817) 461-5868 Metro