Loading...
Northlake 635(4)-CS010710T H .r . C I T Y · 0 F July 10, 2001 Curt Hellen Bob Moore Construction 1110 N Watson Rd Arlington, TX 76011 Northlake 635 Business Park, Lot 1R, Block C (Coppell Tech Center Final Acceptance Dear Curt: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. M. aturity on the bonds/~fll be two years from the date of this letter. Congtrucfion lilspector CC: Ken Griffin, P.E., Director of Engineering/Public Works Rhonda Brothers, Engineering Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal