Northlake 635(4)-CS010710T H .r . C I T Y · 0 F
July 10, 2001
Curt Hellen
Bob Moore Construction
1110 N Watson Rd
Arlington, TX 76011
Northlake 635 Business Park, Lot 1R, Block C (Coppell Tech Center
Final Acceptance
Dear Curt:
A final inspection of paving and utilities for the referenced project has been confirmed by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
M. aturity on the bonds/~fll be two years from the date of this letter.
Congtrucfion lilspector
CC:
Ken Griffin, P.E., Director of Engineering/Public Works
Rhonda Brothers, Engineering Secretary
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal