ST9301-CS 960506' DALLAS COUNTY PUBLIC WORKS May 6, 1996 Mr. Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer City of CoPpell P.O. Box '478 Coppell, Texas 75019 Re: Sandy Lake Road -- DCPW Project No. 91-830 (MacArthur Boulevard to Coppell/Dallas.City Limits) Status- City Review of Preliminary Plans Dear Mr. Griffin: The Preliminary Plans of the referenced project were delivered on March 18, 1996 to Michael A. Martin, E.I.T., Engineering Department, City of Coppell (see attachments). Please finalize any comments Coppell wishes to have Dallas County incorporate into the Sandy Lake Road Design Project as soon as possible. Dallas County remains committed to proceeding with plan completion of the Sandy Lake Road Project to avoid further impact to the overall schedule for the project. Should you have any questions, please do not hesitate to call me. Sincerely, Abel V. Saldafia, P.E. Project Enginee~ AVS: avs Attachments xc: David Howard, P.E., Project Manager, Sverdrup Civil, Inc. 91-830:\Prelim,Com 411 Elm Street Dallas, Texas 75202 653-7151 March 8, 1996 Sverdrup Civil, Inc. 4311 Oak Lawn Suite 300 Dallas, Texas 75219 Dallas County Depmtment of Public Works 411 Elm Street Dallas, Texas 75202 Attn: Mr. Abel V. Saldana, P.E. .Re: Sandy Lake Road - Project No. 91-830 MacArthur Blvd to Coppell City Limit Revised Preliminary Plans Dear Mr. Saldana: Sverdrup Civil, Inc. is pleased to submit revised pre!iminary plans (10 - copies) in accordance with the revised design schedule. The drainage design provides capacity for a portion of Riverview Estates as shown on the drainage area map and as discussed in previous correspondence. Sverdmp would again like to point out that the property must be filled to the appropriate elevation to utilize the drainage system. Also enclosed is an updated Progress Form for your review. Sverdrup looks forward to receiving comments from the County and to finalizing the plans in a timely manner to the satisfaction of all parties involved. Please call if there are any questions or if additional information is desired. Sincerely, SVERDRUP CIVIL, INC. . /- Dav~d Howard, P.E.. Project Manager Enclosures DH/mm c; Omar Feeler, Project Executive, Sverdrup Civil, Inc. Mark G. Goode, Director-Texas Operations, Sverdmp Civil, Inc. Project No. 91-830 PROGRESS FORM FOR THE PERIOD SEPTEMBER 1, 1992 THROUGH MARCH 8, 1996 SANDY LAKE ROAD MacArthur Boulevard to Coppell City Limits Task 1. DATA COLLECTION Task Task Percent Percent Percent Project of Complete Complete Percent Project Last Month This Month Complete 2.80% N/A N/A 2.80% 2. FIELD SURVEYS 11.96% N/A N/A 11.96% 3. ALIGNMENT DRAWINGS 16.90% N/A N/A 16.90% 4. RIGHT OF WAY PLANS 8.04% N/A N/A 7.24% 5. PRELIMINARY PLANS 25.08% N/A 100% 25.08% 6. FINAL PLANS 30.73% N/A N/A 0.00% 7. FINAL CONTRACT DOCUMENTS 4.50% N/A N/A 0.00% TOTAL 100.00% 63.98% File: SANDPROO.x~