Loading...
Northlake 635(4)-CS00061909×0?×00 CITY OF COPPELL ENGINEERING ~ CiTY OF COPPELL COPPELL. TEXAS 7.5019 NO. Gb5 P,O Box 478 C~ppelL Texas 7,5019 972,.4~2-0022 Sune 19. 2000 Pat Acker, P.E. Halff Associates, Inc. 8616 Northwest Plaza Drive Dallas, TX 75225 RE: Coppell Business Center III, Lots l&2, Bloek C Fee Assessment Letter Dear Mr. Acker: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of thc Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $48.558.60 ;md forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of thc assessed fees that need to be paid prior to Council approval. Also provide a copy of thc Engineer's estimate or contzact to our office so thc construction inspection fee can be verified. Providing a copy of your paid r~ceipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forwm'd to working with you on this project. If you have any questions, please Cnntact mc, Sincerely, Kent M. Collins, P.E. Civil Engineer CC: Jennifer Armstrong, Finance Director Debbie Mia'm, Secretary Glenn Hollowell, Assistant Director of Public Work~ Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services 0~×07×00 12:33 214 504 5590 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.653 )repared by _ , ,,~ Approved by FUN[:)~ CITY OFCOPPELL dOURNAL ENTRY DATE: (~-~.~-~c~ ~E. NO ..... POSTED BY:__ DATE:. DESCRIPTION ACCOUNT DR, CR. NUMBER TOTAL ~.,~ ~ ~.,--- 09/07/00 12:ZS CiTY OF COPPELL ENGINEERING -~ CITY OF COPPELL DEVELOPMENT FEE TABLE N0.655 Project: Coppell Business Center 111, Lot 1&2, Block C Date: o6/19/~oo0 TOTAL AMOUNT DUR FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% inspection due prior to Council Approval) Water Tap Fee (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) (I00 % due at Issuance of Water Meter) Water Meter Fee (Irrigatiou/Fireline) (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) t/ $35.00 (100% due at Issuance of Water Meter) lrrigation/Fireline Meter Deposit (100% duc at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee (100~ due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 . (100% clue at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $36,633.60 $36,633..60 (100% due prior to Council Approval) Street Light Fee rnforma~ion not AVailable (100% due prior to Acceptance of Project Street Sign Fee Information not Available (100% due prior to Acceptance of Project Collstruction Inspection Fee Information not Available tOTAL $55,802.10 TOTAL ,AMOUNT DUE PRIOR TO COUNCIL APPROVAL $48,558.60 ~"'~ PROJECT: DATE: CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL DEVELOPMENT FEE WORKSHEET Coppell Business Center 111, Lot l&2, Block C 06/19/2000 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Firellne Meter(s): 1 - 2 inch = 8 ESU's 1 - 2 inch = 8 ESU's 0 = 'b ESU's 2 - 8 inch = 2.5 ESU's Total #: 18.5 ESU's ~ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 4 Connections ~ $50.00 es. (Single family due odor to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: I Domestic Meter(s) ~} $192.05 (Single family due prfor to issuance of building permit) (All other developments due prior to issuance of meter) 'rigafion/FireUne Water Meter Fee: Total #: 1 Irrigation Meter(s) ~ $192.05 Total #: 0 Additional Irrigation Meter(s) ~ $0.00 Total #: 2 Fireline Meter(s) ~ $3,217.20 '(t00% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: I Meter(s) ~ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) I~ ~30.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 8 @ $450.00 ea. Wastawater Tap Inspection Fee: Total #: 1 Connections ~ $50.00 ea. (100% due punt to issuance of building permit) Utility Final Inspection Fee (All developments): ~ Total #: 1 Lots ~ $50.00 ea. {100% due prior to issuance of building permit) N0.655 $8,325,00 $200.00 $192.05 $192.05 $0.00 $6,434.40 $35.00 $80.00 $3,600.00 $50,00 Page 1 12:34 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL DEVELOPMENT FEE WORKSHEET N0,653 Park Fee (For Residential Developments Only): * Preliminary plat approved: 0 o Single-family ~ $0.00 per lot Multi-family ~ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until seer T,U, Electr~ submits the lighting plan for the proposed development, Once the plans are submitted. $292,60 per light will be assessed, (100% due prior to final acceptance of development) $0.00 thfcm~ation not Avaaable ,,,,Street Sig- Fees: Assessed for signage in the City's right-of-way. (See attached fee caloulations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assesament. The contracts should indic, ate the cost to Construct the improvements that are inspected by the Engineering Department. (2% of development cost required for p~vete improvements) (4% of development cost required for public improvements) Information not Available Page 2 09/g?/00 12:34 NU.b~ ~ PROJECT: DATE: CITY OF COPPELL ENGINEERING -~ CITY OF COPPELL ROADWAY IMPACT FEE CALCULATIONS Coppell Buzt~tsz Center III, Lot l&2, Blod~ C O~/l~f20OO ROADWAY lMPACT ~ Sez~ice Area * 10 e~le Maes ~ ~elo~t U~I) x ~ ~ V~icle ~e) = ~6,~3.~ * (Figure 2 - Roadway Impac~ Fee Study) ** (Table 3 - Roadway/m~t Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) 09/07×00 1~:34 CiTY OF COPPELL ENGINEERING -~ CITY OF COPPELL N0.653 COPPELL, CITY OF P.O. BOX 478 COPP~LL, TX 75019 " I , ~o~s...:~o]~o~,: ,']~soa6~'q'~;" ' ........