Parks Coppell-CS 921102COPPELL PUBLIC WOPJfS
DATE:
TO:
FROM:
HE:
The following
project.
November 2, 1992
Ken Griffin, City Engineer
Public Works Staff
Development Fees for Mill Creek Estates
fees should be assessed on the above
referenced
Water Impact Fee:
77 - 5/8"x3/4"
Domestic Meter/s = 77~ ESU's
Irrigation Meter/s = ESU's
Fireline Meter/s = __ ESU's
Total 77 ESU's 6 $650.00 ea = 50,050.00
100% due prior to Council approval of final plat.
* This assessment does not include irrigation meter impact
due to that information not being available at this time.
Waetewater Impact Fee: (Mud)
77 - 5/8"x3/4" Domestic Meter/s = 77 ESU's ~ 225.00
= 17~.00
100% due prior to Council approval of final plat.
Water Tap Inspection Fee
77 Connections ~ $100.00 each = $7,700.00
100% due prior to issuance of building permit.
Sewer Tap Inspection Fee
77 Connections ~ $100.00 each = $7,700.00
100% due prior to issuance of building permit.
Utility Final Inspection Fee
77 Residential Homes ~ $50.00 each = $3,850.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
77 Residential Lots at $150.00 each = $11,550
Units (Multi family) at $75.00 each =
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/dm
cc: Steven G. Goram, Director of Public Works
STREET SIGN ASSESSMENT
for Mill Creek Estates
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
~IGN UNIT PRICE
No Parking $ 53.10
Speed Limit $ 63.54 11
Yield $ 58.56
Street Name $ 11.60
Stop & Street Combo $ 96.85 4
OTHER
EXTENDED PRICE
$ 698.94
$ 387.40
TOT
* Cost breakdowns may be obtained from Public Works by written
request.
MILLCK.