Loading...
ST9301-CS 960308March S, 1996 Sverdrup Civil, Inc. 4311 Oak Lawn Suite 300 Dallas, Texas 75219 214 520-2116 Dallas County Department of Public Works 411 Elm Street - Dallas, Texas 75202 Attn: Mr. Abel V. saldana, P.E. Re: Sandy Lake Road - Project No. 91-830 MacArthur Blvd to Coppell City Limit ReviSed Preliminary Plans Dear Mr. Saldana: ( Sverdrup Civil, Inc. is pleased to submit revised preliminary plans (10 - copies) in accordance with the revised design schedule. The drainage design provides capacity for a portion of Riverview Estates as shown on the drainage area map and as discussed in previous correspondence. Sverdrup would again like to point out that the property must be filled to the appropriate elevation to utilize the drainage system. Als~ enclosed is an updated Progress Form for your review. Sverdrup looks forward to receiving commea3t~ from the County and to finalizing the plans in a timely manner to the satisfaction of all l~arties involved. Please call if there are any questions or if additional information is desired. Sincerely, SVERDRUP CIVIL, INC. David Howard, P.E. Project Manager Enclosures DH/mm C: Omar Feeler, Project Executive, Sverdrup Civil, Inc. Mark G. Goode, Director-Texas Operations, Sverdrup Civil, Inc. Project No. 91-830 PROGRESS FORM FOR THE PERIOD SEPTEMBER 1, 1992 THROUGH MARCH 8, 1996 SANDY LAKE ROAD MacArthur Boulevard to Coppell City Limits Task 1. DATA COLLECTION Task Task Percent Percent Percent Project of Complete Complete Percent Proiect Last Month This Month Complete 2.80% N/A N/A 2.80% 2. FIELD SURVEYS 11.96% N/A N/A 11.96% 3. ALIGNMENT DRAWINGS 16.90% N/A N/A 16.90% 4. RIGHT OF WAY PLANS 8.04% N/A N/A 7.24% 5. PRELIMINARY PLAN S 25.08% N/A 100% 25.08% 6. FINAL PLANS 30.73% N/A N/A 0.00% 7. FINAL CONTRACT DOCUMENTS 4.50% N/A N/A 0.00% TOTAL 100.00% 63.98%