ST8502-CS 870811 GINN, INC.
August 11, 1987
CONSULTING ENGINEERS
/
Alan D. Ra~ff, City Manager
City of ~ppell
Poet O~ice Box 478
Texas 75019
Coppel~,
Re: Signalization at Moore/Belt Line Intersection
Dear Mr. Ratliff:
Enclosed is backup information regarding the above referenced
location that is in the City of Dallas city Limits.
Per the August 8, 1986 correspondence from Dallas regarding the
signalization at this intersection, they agreed to allow the
signal to remain until the completion of the Moore Road
construction. At this time, since the construction has been
completed, the City of Dallas req~/ires a new traffic signal
warrant study be performed and provided to them for their review
and consideration. Also, they want any accident history records
for this location.
We request Chief Griffin submit to our office any accident
history records at this time. Additionally, we are proceeding
with the signal study. After we have compiled the necessary
submittal package for the City of Dallas, we shall submit the
material to you along with a cover letter to Dallas, prepared for
your signature, that formally requests the signal to remain at
this location.
We anticipate the study to be completed by September 1, 1987. We
shall keep you advised on our progress.
~~/~--~Sincerely'
H. Wayne Ginn, P.E.--
ARSO4/TFC
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/2484900