Loading...
ST8502-CS 870811 GINN, INC. August 11, 1987 CONSULTING ENGINEERS / Alan D. Ra~ff, City Manager City of ~ppell Poet O~ice Box 478 Texas 75019 Coppel~, Re: Signalization at Moore/Belt Line Intersection Dear Mr. Ratliff: Enclosed is backup information regarding the above referenced location that is in the City of Dallas city Limits. Per the August 8, 1986 correspondence from Dallas regarding the signalization at this intersection, they agreed to allow the signal to remain until the completion of the Moore Road construction. At this time, since the construction has been completed, the City of Dallas req~/ires a new traffic signal warrant study be performed and provided to them for their review and consideration. Also, they want any accident history records for this location. We request Chief Griffin submit to our office any accident history records at this time. Additionally, we are proceeding with the signal study. After we have compiled the necessary submittal package for the City of Dallas, we shall submit the material to you along with a cover letter to Dallas, prepared for your signature, that formally requests the signal to remain at this location. We anticipate the study to be completed by September 1, 1987. We shall keep you advised on our progress. ~~/~--~Sincerely' H. Wayne Ginn, P.E.-- ARSO4/TFC 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/2484900