Loading...
ST8502-CS 870715GINN, INC. CONSULTING ENGINEERS July 15, 1987 Mr. Ray Bailey Ashlar Contracting Company Post office Box 713 Lewisville, Texas 75067 Re: Moore Road Improvements Final Punch List Dear Mr. Bailey: I would like to reiterate our discussion on 7/2/87 in reviewing the final punch items (list attached). In brief, there are three categories that we divided the final punch list into. Category one (1) are items which will need to be addressed at this time in order to receive final acceptance on this project. Category two (2) are items which we are concerned about at this time; however, the current condition of these items does not create any serious problems with the integrity of this project as they exist currently. Should problems arise in the future, however, we will expect Ashlar to honor their one-year letter of guarantee per the contract and address any items requested by the city at that time. Category t~ree (3) are items we do not authorize you to address at this tIme since they are not part ~f your current c~ntract with the city of Coppell. .Upon.authorlzat~on from th~ city, we may request for ~ou to submlt pr%ces for some of these lt~s at a later date. This extra work if requested, however, will not affect your efforts to obtain final completion status on this project. Listed below are categories 2 and 3. Any items not listed are included in the first category and must be resolved for final acceptance. Category #2, as follows: 4, 16, 21, 28, 35, 37, 46, 51, 52, 64, 70, 73, 78, 80, 81, 82, 90, 91, 98, 101, 108, 110, 125, 131, 132. Mr. Ray Bailey July 15, 1987 Page 2 Category #3, as follows: 5, 10, 23, 38, 74, 116, 118, 120, 126, 128, 132, 134. If you have any questions on the above, please feel free to call. Sincerely, Walter M. Ellison, Jr. /jc Wayne Ginn Kevin Peiffer W. K. Wolfe, Jr. Steve Goram ASH712§4