ST8502-CS 850624GINN, INC.
CONSULTING ENGINEERS
June 24, 1985
Moore Road Residents
Dear Resident=
This is to let you know that the City Council will consider
construction of Moore Road Improvements at a special Council
meeting on Tuesday, July 2, 1985, at 7:30 p.m. at Coppell
High School Cafeteria.
This topic was originally scheduled for the June 25 City
Council meeting but has been postponed due to a lengthy
agenda.
Our firm will be present at this special meeting to answer
any questions you might have.
Sincerely,
H. Wayne Ginn, P.E.
City Engineer
cc: Mayor Dugqan
Steve Goram
16135 Preston Road · Suite 106 · Dallas, Texas 75248 * Phone 214/386-6611
SECTION 00020 - ADVERTISEMENT FOR BIDS
Sealed proposals addressed to the CITY OF COPPELL, Texas for
MOORE ROAD IMPROVEMENTS will be received at the City of Coppell
City Hall, 616 S. Coppell Road until 10:00 a.m., September 12,
1985, and then publicly opened and read aloud.
The Instructions to Bidders, Proposal Forms, Forms of
Contract, Plans, Specifications and Forms of Bid Bond, Performance
and Payment Bond, and other contract documents may be examined at
the following:
Ginn, Inc., Consulting Engineers
16135 Preston Road, Suite 112
Dallas, Texas 75248
(214) 386-6611
Copies may be obtained at the office of Ginn, Inc. for a
deposit of $75.00 per set, non-refundable.
The Owner reserves the right to waive any informalities or to
reject any or all bids.
Each bidder must deposit
amount, form and subject to
Instructions to Bidders.
with his bid, a security in the
the conditions provided in the
PRINCIPAL ITEMS OF WORK INCLUDED IN THIS PROJECT ARE:
Construction of approximately 5,300 1.f. of 37' wide concrete
pavement including grading, curb and gutter, pavers, storm sewer,
utility relocation, asphalt pavement transitions, a new reinforced
concrete bridge, removal of an existing bridge, and related
construction. Concrete pavement shall consist of approximately
21,000 s.y. of 6" thick reinforced concrete with monolithic curb
and gutter on lime-treated subgrade. The storm sewer consists of
approximately 4,800 1.f. RCP, 480 1.f. pre-cast RCBC, headwalls,
wingwalls, and related appurtenances. The new bridge will span
Grapevine Creek and consist of 170 1.f. of reinforced concrete
T-beam on 4 pier walls and 2 abutments with related foundation.
CITY OF COPPELL
LOU Du~yo r
Date
(PLANS WILL BE AVAILABLE AUGUST 26, 1985)
Advertisement dates:
August 25, 1985
September 1, 1985
September 8, 1985
T