Loading...
ST8502-CS 850624GINN, INC. CONSULTING ENGINEERS June 24, 1985 Moore Road Residents Dear Resident= This is to let you know that the City Council will consider construction of Moore Road Improvements at a special Council meeting on Tuesday, July 2, 1985, at 7:30 p.m. at Coppell High School Cafeteria. This topic was originally scheduled for the June 25 City Council meeting but has been postponed due to a lengthy agenda. Our firm will be present at this special meeting to answer any questions you might have. Sincerely, H. Wayne Ginn, P.E. City Engineer cc: Mayor Dugqan Steve Goram 16135 Preston Road · Suite 106 · Dallas, Texas 75248 * Phone 214/386-6611 SECTION 00020 - ADVERTISEMENT FOR BIDS Sealed proposals addressed to the CITY OF COPPELL, Texas for MOORE ROAD IMPROVEMENTS will be received at the City of Coppell City Hall, 616 S. Coppell Road until 10:00 a.m., September 12, 1985, and then publicly opened and read aloud. The Instructions to Bidders, Proposal Forms, Forms of Contract, Plans, Specifications and Forms of Bid Bond, Performance and Payment Bond, and other contract documents may be examined at the following: Ginn, Inc., Consulting Engineers 16135 Preston Road, Suite 112 Dallas, Texas 75248 (214) 386-6611 Copies may be obtained at the office of Ginn, Inc. for a deposit of $75.00 per set, non-refundable. The Owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit amount, form and subject to Instructions to Bidders. with his bid, a security in the the conditions provided in the PRINCIPAL ITEMS OF WORK INCLUDED IN THIS PROJECT ARE: Construction of approximately 5,300 1.f. of 37' wide concrete pavement including grading, curb and gutter, pavers, storm sewer, utility relocation, asphalt pavement transitions, a new reinforced concrete bridge, removal of an existing bridge, and related construction. Concrete pavement shall consist of approximately 21,000 s.y. of 6" thick reinforced concrete with monolithic curb and gutter on lime-treated subgrade. The storm sewer consists of approximately 4,800 1.f. RCP, 480 1.f. pre-cast RCBC, headwalls, wingwalls, and related appurtenances. The new bridge will span Grapevine Creek and consist of 170 1.f. of reinforced concrete T-beam on 4 pier walls and 2 abutments with related foundation. CITY OF COPPELL LOU Du~yo r Date (PLANS WILL BE AVAILABLE AUGUST 26, 1985) Advertisement dates: August 25, 1985 September 1, 1985 September 8, 1985 T