Loading...
ST9301-CS 960105January 5, 1996 Dallas County Department of Public Works 411 Elm Street Dallas, Texas 75202 Sverdrup Civil, Inc. 431 ' Oak Lawn Suite 300 Dallas Texas 75219 214520-2116 Attn: Mr. Abel V. Saldana, P.E. Re: Sandy Lake Road - Project No. 91-830 MacArthur Blvd to Coppell City Limit Drainage from Riverview Estates Dear Mr. Saldana: Per you letter dated January 2, 1996 regarding Riverview Estates drainage Sverdrup Civil, Inc. has rev/ewed the Pre 'lmainary Plat dated September 4, 1991 and a February 29, 1992 Topographic/Base Map of the area. Based on this information Sverdrup Civil, Inc. developed calculations and a storm sewer profile to incorporate the area zoned "Retail" (6 Ac +/-) along Sandy Lake Road into the Sandy Lake Road drainage system. These calculations and proffie area based on the City of Dallas drainage criteria, and assume that the "Retail" area will be picked up on site and not allowed to flow over the Sandy Lake Road top of curb. Further the calculations assume approximately 80% of the "Retail" area will drain to east, and 20% will drain to the west. Attached is a sketch of the portion of the profile to be incorporated into the final design of the Sandy Lake Road Bridge Project by Charles Oojer and Associates. Also a detailed review of the project milestone dates and schedule is underway, and will be completed as soon as possible. Sverdrup will make every effort to expedite the project, however the suggested submittal date of February 13th, 1996 for Phase I may slide a week or two. The Revised Design Progress Form and Bar Graph Schedule will be submitted shortly. Please feel free to call if there are any questions. Sincerely, SVERDRUP CIVIL, INC. David Howard, P.E. Project Manager EnclosUres DH/mm c'. Omar Feeler, Project Executive Sverdmp Civil, Inc. Mark G. Ooodc, Director~ Texas Operations, Sverdmp Civil, Inc. :11 446,0 SANI / ! 1