Loading...
ST9301-CS 960123 (2)411 E~ SW~ D~I~, Te~ 75202 A~: ~.AbelV. S~d~P.E. ~ ls'c~ ~ ~ ~~ Re: ~dy~eR~.~0j~No, gl.830 ~ ~ ~e m ~ ~ ~ ~ ~' (6 ~ ~-) ~ ~ ~e R~ ~e ~ ~e ~~ ~d ~o~e m~ ~ ~ ~e ~ of~ ~e ~ ~e ~" ~ ~ ~ ~ ~ ~ rite ~d n~ ~o~ ~ flow ~ of~. ~ ~e ~~ ~e ~o~ ~ of ~e ~' Attached is a skel~ ofthe portim ofthe I~ofile to be incmlmrated into the fmal design of the ~andy Lake Road Bridge Project by Clu~les Oojer and Associates. ' Also a detnfled review oftbe ~ro~ect milestone dates and schedule is underway, and will be completed as soon as possible. Sverdrup will make every effoff to expedite the project, however the suggested submittnl date of Februmy 13th, 1~6 ~ Phase I ma,/slide a week ~ two. T"ne Revised Design Prof2~m . Form and Bar Graph Schedule will be subtnitt__,M shortly. Please feel fzee to call if th.ere ar~ any questions. David Howard, P.E. Project Manager Enclosures COt~ DiR~.C~OR c: Omar Fcckr, Prokct Execut~ Sverdmp Civn, Inc. ~TC~'5 Of