Loading...
ST9905DR-CS051128COPPELL November 28, 2005 Chris Dixon Craig Olden, Inc. PO Box 5000 Little Elm TX 75068 RE: ST 99-05 Bethel Rd Drainage, Phase A Dear Chris: A pre-construction conference on the referenced project has been scheduled for Thursday, December 1, 2005 at 2:00 p.m. in the second floor conference room in Town Center at 255 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at (972) 304-3685. Sincerely, Garreth Campbell, Construction Inspector Office Phone: 972-304-3685 Fax: 972-304-3570 Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Richard Gee, Texas CMT RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner / owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner / owner representative's responsibility to notify the following parties: · Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) · Geotechnical firm · Project Engineer · Contractors or subcontractors for excavation, utility, & paving operations · SWPPP representative