Loading...
ST9301-CS 960102DALLAS COUNTY PUBLIC WORKS January 2, 1996 Mr. David Howard, P.E. Sverdrup Civil, Inc. 4311 Oak Lawn Avenue, Suite 300 Dallas, Texas 75219 Rei Sandy Lake Road - Project No. 91-830 (MacAtthur Boulevard to Coppell/Dailan City Limits) Pre 'hminary Alignment Approval and Final. Plan Completion. Dear Mr. Howard: Per our conversation today, the Pre'hminary Alignment of the referenced project ~has been approved by .the City of Coppell (see attachment). Sverdrup Civil, Inc., is hereby released to finalize design and construction plans. Please proc~d with plan completion in a timely manner to aVoid further impact to the overall schedule for the project. Sverdrup's Professional Services Contract indicates the total time to complete the work is 30 calendar weeks, eXclusiVe of City/County review time. This time duration cons/.~ of: 1. Phase l/Pre 'hminary Investigation and Design'- 16 calendar weeks. Pre 'hminary Design Plans (including plan/profiles for paving and drainage, drainage area map, etc.) -.16 calendar weeks Right-of-Way Plans (including parcel deed descriptions and individual plats) - 12 calendar weeks. 2. Phase II/Preparation of Detailed Drawings and Specifications - 14 calendar' weeks. A 'cursory review of the Contract and the current status of the plafis has determined the following: 1. ~' Submittal Date for Phase I - February 13, 1996 (six calendar weeks from today). City/County review time shall be' approximately two calendar weeks (Approval of Phase I - February 27, 1996). 3. Submittal Date for Phase ll - June 4, 1996 (22 calendar weeks from today).. 411 Elm Street Dallas, Texas 75202 653'-7151, Mr. David Howard, P.E. January 2, 1996 Page Two City/County review time shall be approximately four calendar weeks (Approval of Phase II - July 2, 1996). Please review these milestone dates for concurrenCe and note various utilities will need relocation and Right-of-Way parcels acquired prior'to construction, which is scheduled to commence (next) winter, 1996. A submittal of a Revised Design Progress Form and Bar Graph Schedule is required verifying the aforementioned contract milestones along with an Anticipated Quarterly Drawdown for budgeting purposes. If it is possible to compress the Contract phase(s) time durations without sacrificing the quality of the work, please do so in order to expedite the project. Also per our conversation, please research the Riverview Estates Preliminary Plat (a.k.a. the Johnny Thompson Tract), of which copies were distributed to Sverdrup and Dallas County at our November 16, 1995 meeting with the City of CoppeH, for drainage requirements. A cursory review of the Preliminary Plat and a February 29, 1992 Topographic/Base Map for this area has determined approximately 6 acres +/- zoned #R" (retail) will roughly contribute ~ c.f.s. +/- to the Sandy Lake Road storm sewer system. Please verify this by hydrologic/hydraulic calculations and profile as soon as possible in order to incorporate into the Sandy Lake Bridge Project, under final design by Gojer and Associates, with the appropriate sized downstream, drainage system. Should you have any questions, please do not hesitate to call. Sincerely, Abel V. Saldafia, P.E. Project Engineer AVS:avs ~ Attachments xc: Comm[~icmer Jim Jackson, District 1 Irv S. Griffin, P.E., Project Engineer, Dallaz County Public Wcti~ Kenneth M. Oriffm, P.E., Assistant City Man~ger/City Engineer, City of Coppell P.O. Box 478 Copl3ell. Texas 75019 214-462-0022 December 18, 1995 Allen Bud Beene, P.E., Director of Public Works Dallas County 411 Elm Street Dallas, Texas 75202 Re: Sandy Lake Road from MacArthur Blvd. to east city limits (ST 93-01). Dear Mr. Beene: At the December 12, 1995 council meeting, City CoUncil approved the conceptual 'plans for Sandy Lake Road from MacArthur Bird to the east city limits as presented. Therefore, this letter is your official notification that the City of Coppell is in agreement with the conceptual plans as presented. If you should have any qu. estions please feel free to contact me at your convenience. Sincerely, K~th M.~fi ~ffm, ~.E. Assistant City Manager/City Engineer DEC 2 0 1995 COUNTY DIRECTOR OF. PUBUC WORKS