Vista Ridge 1R-8 D-LR051116SAM ENGINEERING & TESTING, INC.
1~ Serving The Geo-lndustry Since 1974 1115 Luke Street, Suite 100
Irving, Texas 75061
Phone: (972) 790-1910 · FAX: (972) 790-0967
CONCRETE PLACEMENT INSPECTION & STRENGTH TEST REPORT
CLIENT:
=ROJECT:
JBP, LP
5301 Village Creek Drive, Suite
Piano, TX 75093 ~
The Plaza Infrastruct~J~
Highway 121 & Ridgemont
Lewisville & Coppell, TX
~.TTN: Neal Heckel
IClAN: Jeremy Speaks
STANDARD 6" X t2"
AREA 28.27 SQ. IN.
REPORT DATE: 11/16/05
SAMPLE DATE: 10/18/05
PROJECT NO.: 308TXIK5
REPORT NO.: 36
Deceleration Lane - Comer of Plaza Blvd. & Hi
PAGE 1 OF 1
Time Ardved: 10:50 AM
Time Left: 12:00 PM
Slump (Inches): 4
Concrete Temperature (F): 90
% Air Content: 3
Total No. of Test Cylinders Made: 4
Total Cubic Yards Placed: 10 Yards
~dded Water: N/A
Weather Conditions:
Air Temperature (FI:
ht of Fresh Concrete:
Hot & Sunny
75
147
Concrete Supplier:.
Ticket #:
Beall Concrete
89048596
Truck #: 1015
Time Batched: 10:10 AM
Time Sampled: 11:30 AM
Product Code: 340L1504
Cement: N/A
FI~ Ash: N/A
Coarse A~lre~ate: N/A
Water: N/A
Air Content: N/A
lA 7 10/25/05 146
lB 14 11/1/05 147
1C 28 11/15/05 147
1D 28 11/15/05 147
Curing ASTM C-31
78,000 2758 Shear 4000128
3041 4000/28
117,000 4138 e Shear 4000/28
121,000 4279 e Shear 4000~28
Test Method Made By:
ASTM C-39 & 231 SE&T SE&T
Slump ASTM C-143
Remarks: Tested concrete meets/exceeds required strength.
Very Truly Yours,
Sadik (SAM)AI-Musawe, M.Sc., Ph.D., P.E.
Civil & Environmental Engineer
Texas Registration Number: 61893
This report is for the sole use of the client addressed. The use of our company name must receive our pdor written consent.
This report only applies to the samples tested and does not necessarily represent [denticel or similar samples.
G:120051308txik51CpistrlCpistr361BE