Loading...
Coppell Trade-LR051108REPORT OF REINFORCING & POST TENSION STEEL OBSERVATION " rfacon Date of Service: Client No.: Client: 11/08/05 93345 Coppell Trade Center LP 5055 Keller Springs Rd Ste. 300 Addison, TX 75001 Report No.: 94051190.0157 Project No.: 9405119~ "' Prelect: C~,~ll Trade Center - Bld~;~' ""~qWC Sandy Latce/vree~ort Pkwy Coppell, TX Services: Drawings Utilized: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA 2 and 3 of 16/Al.01, dated 02/21/05 and 10/25/05 Locations/Items Observed: Fire Lane and Dock Parking on W side of Building C, from middle of building to N end of building; Dumpster Pad and Transformer Pad Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Field Results Report TO: Technician: E. Jernigan Report Distribution: (1) Coppell Trade Center LP (1) TechniStructures (1) City of Coppel[ TX (1) City of Coppell TX Discrepancies/Comments: Any discrepancies found were corrected at the time~ observation unless otherwise noted. 309acs (1) McFadden & Miller