Loading...
CF-Cozby Library-LR051103i one Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF DRILLED PIER INSPECTION Client: City of Coppel! Ms. Sherri Moino PO Box 9478 Coppell TX 75019 Project: WT Cozby Public Library ~ '-'Y77 N ~ Coppell, Texas Services: Drilled Pier Inspection Report No.: 244075 Project No.: 0510866 Date of Service: 10/26/2005 Report Date: 11/03/2005 Report of Inspection On this date, a Rone Engineering Services, Ltd. representative(s) arrived on site as scheduled to perform Drilled Pier Inspection. The results are attached. Technician Time: Page 1 of 2 Technician: Paul Leigh Report Distribution: (I) CiW of Coppoll (i) CiW of Coppcll (l) City of Coppetl (i) H-B Construction, Inc. 8:30am - 4:00pm K Scott Watson, AET CMT Operations Manager LIMITATIONS: The test results presented bercm were prepared based upon the specific samples provided for testing We assume no responsibilit~ for variation in quali~ (composition, appearance, etc.) or any other feature of similar subject manet provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed ~d shall not be reproduced except in full without the written approval of Rone Engineering Ser~iees, Ltd. ~9SS RONE ENGINEERING SERVICES, LTD. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: City o£ Coppell Report No.: 244075 Project No.: 0510866 Project: WT Cozby Public Library Date of Service: 10/26/2005 Page 2 of 2 Driller: King Piering Pier Identification A/12 A/12.9 D/14.1 Pier Diameter (in) 18 18 18 Depth of Pier From Surface (it) 22.50 22.20 24.50 Depth of Bearing Stratum From Surface (fi) 15.50 16.20 18.20 Required Penetration (fi) 6.00 6.00 6.00 Actual Pene~'ation (fi)* 7.00 6.00 6.30 Condition of Bottom (wet / dry) Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Casing Diameter (in) / Casing Length (It) 20/16 20/16 20/18 Number of Bars / Reinforcing Bar Size 5/#6 5/#9 5/#9 Length of Reinforcing Steel (It) 19.70 19.80 21.90 Time Drilling was Completed (am / pm) 12:03 PM 1:37 PM 2:10 PM Time Concrete was Placed (am / pm) 2:47 PM 2:52 PM 3:05 PM Depth of Pier From Top of Concrete (fi) 20.00 20.10 22.20 Elevation: Surface (fl)** N/A N/A N/A Elevation: Top of Pier (It)** N/A N/A N/A Elevation: Bottom of Pier (It)* * N/A N/A N/A Elevation: Top of Bearing Stratum (It.)** N/A N/A N/A Bearing Stratum (description) Gray Shale Note: See report # for Compressive Strength Test Specimens. · Additional Penetration not requested unless noted. **Elevation by others Remarks: LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject mailer provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the ctients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. one Engineering. Client: City of C0ppf'~''~ Ms. She~.~oino PO Bo~478 '11 TX 75019 Project: WT Cozby Public Library 177 N Heartz Coppell, Texas Services: Drilled Pier Inspection 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF DRILLED PIER INSPECTION Report No.: 243982 Project No.: 0510866 Date of Service: 10/25/2005 Report Date: 11/03/2005 Report of Inspection On this date, a Rone Engineering Services, Ltd. representative(s) arrived on site as scheduled to perform Drilled Pier Inspection. The results are attached. Technician Time: Page 1 of 2 Technician: Paul Leigh Report Distribution: (1) City of Coppell (i) Cit~ of Coppell (1) City of Coppell (1) H-B Cons'a'uction. Inc. 7:00am - 2:00pm K. Scott Watson, AET CMT Operations Manager · LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wriRen approval of Rone Engineering Services, Ltd. 99TM Pa~e 1 ofl RONE ENGINEERING SERVICES, LTD. REPORT OF STRAIGHT SHAFT PIER INSPECTION Client: City of Coppell Report No.: 243982 Project No.: 0510866 Project: WT Cozby Public Library Date of Service: 10/25/2005 Page 2 of 2 Driller: King Piering Pier Identification B.5/12 ~f. 5/12.9 C/13.8 // Pier Diameter (in) J 18 ~ 1 ~ ~ Depth of Pier From Surface (fi) 24.30.~.___ ~'J2'~"~- 22.10 Depth of Bearing Stratum From Surface (fi) 18.00 18.50 16.00 Rec[uired Penetration (fi) 6.00 6.00 6.00 Actual Penetration (fi)* 6.30 6.10 6.10 Condition of Bottom (wet / dry) Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Casing Diameter (in) / Casing Length (ft) 20/18 20/18 20/18 Number of Bars / Reinforcing Bar Size 5 / #6 5 / #6 5 / #6 Lento'th of Reinforcing Steel (ft) 21.90 22.10 19.60 Time Drilling was Completed (am / pm) 9:30 AM 10:27 AM 11:26 AM Time Concrete was Placed (am / pm) 1:21 PM 1:35 PM 4:44 PM Depth of Pier From Top of Concrete (fi) 22.20 22.40 19.90 Elevation: Surface (fi)** N/A N/A N/A Elevation: Top of Pier (ft)** N/A N/A N/A Elevation: Bottom of Pier (fi)** N/A N/A N/A Elevation: Top of Bearing Stratum (fi.)** N/A N/A N/A Bearing Stratum (description) Gray Shale Note: See report # for Compressive Stxength Test Specimens. ~ Additional Penetration not requested unless noted- **Elevation by others Remarks: Smd-by time 2:00-4:00 due to hitting pipe. LIMITATIONS: The test resu~ presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for vacation in quality (c~pesttion, appearance, perfon'r~nce, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no contm~. Our letters and reports are for the exclusive use of Ihe clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services. Ltd.