RE: Denton Tap Development Addition, Lot 3, Block A
Construction Plan Review Comments
Dear Mr Arshouk:
The City of Coppell has reviewed the revised plans for the referenced addition. These plans
meet our current minimum standards with the exception of the following comment:
1. Place a valve to isolate the westernmost fire hydrant. The valve should be along the 6" fire
line between the hydrant and the tee.
Once this change has been made, please submit three sets of revised final construction plans for
the City Engineer's stamp and as many copies as necessary for your contractors' construction
operations. All contractors and subcontractors onsite must have a copy of the plans stamped and
approved by the City of Coppell.
All fees must be paid prior to release of this project for construction. The City charges a 2%
inspection fee for all private construction outside the building's footprint. This would include
dirt work, paving, storm drain, water lines, sewer lines, drainage pipes, etc. that are private. For
all installations in public right-of-way, the City of Coppell charges a 4% fee. A check for
inspection fees made to City of Coppell should be submitted to this office along with a copy of
the contract(s) with the appropriate 2% and 4% calculations shown for verification purposes. If
you have any questions, please contact me at your convenience.
Sincerely,
Charlene La Mattr'na, E.I.T.
Graduate Engineer
Office Phone: (972) 304-3681
Fax: (972) 304-3570
CC:
Mark Wainscott, Architect, via fax: 722-7635
Kushal Basu, Owner, via e-mail: kushal.basu~nokia.com