Northlake 635(2)-CS 970113Prepared by
Approved by
CITY OF COPPELL
JOURNAL ENTRY
FUND: DATE:
J.E. NO ......
DESCRIPTION ACCOUNT DR. CR.
NUMBER
POSTED BY:
DATE:
D~v ELOPMENT FEE WORKSH~("
AOJECT: Replat of Lot 1, Block A, Northlake 635 Business Park (Lincoln Business Park)
.~ATE: 11/1/96
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
3 - 2 inch = 24
I - 2 inch = 8
2 - 8 inch = 2.5
Total #: 34.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
ESU's ~' ~
ESU's
ESU's
$15,525.00
Water Tap Inspection Fee:
Total #: 6 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
~ (All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 3 Domestic Meter(s) @ $195.98
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter(s) @
Total 8: 0 Additional Irrigation Meter(s) @
Total #: 2 Fireline Meter(s) @
{100% due prior to issuance of water meters)
$195.98
$2,580.90
Water Meter Deposit Fee (Domestic):
Total #: 3 Meter(s) @ $30.00.ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter{s) @ $35.00 ea.
(100% due prior to issuance of water meters)
$300.00
$587.94
.98 \
¢ s9o.oo ,,,
$105.00 · ( -'
Wastewater Impact Fee:
Total Domestic Meters ESU's
24
@$450,00 ea.
010,800.00
$150.00
$150.00
Wastewater Tap Inspection Fee:
Total #: 3 Connections @ 050.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 3 Lots @ $50,00 ea.
'~ (100% due prior to issuance of building permit)
Page 1