Loading...
Northlake 1nd Park-LR 891107Municipal and Util#y Contractor's Services ATTENTION: Dear Sir, On 11-7-89 , our company was contracted to perform sewer testing on North Lake Industrial job for Delekta Construction . Our testing was completed on 11-7-89 and met all the air testing and deflection requirements, per the City of Coppell specifications. We appreciate the opportunity to service the City of Coppell and hope to continue to provide our services to klocal~cQn~ractors~in the near !~uture. GTS/ps P. O. BOX 160425 · IRVING, TEXAS 75016 · (214) 556-0188 LOW PRESSURE AIR PEST FOR GRAVITY SANITARY SEWER TEST PROCEDURE E~ch-s~ction of sewer shall be tested between successive manholes. Air shall be introduced into the pipeline until 4.0 psi guage pressure has been reached at which time the flow of air shall be reduced and the internal air pressure shall be maintained between 3.5 and 4.5 psi guage for at least two (2) minutes to allow the air temperature to come to equilibrium with the temperature of ;he pipe walls. Pressure in the pipeline shall be constantly monitored by a cjuage and hose arrangement seperate from the hose used to introduce air into the line. Pressure in th~ pipe line sh~ll not be ~llow~d to exceed 5 :~si. After the temperature has'stabilized and no air leaks at the plugs have been found, the air pressure shall be permitted to drop and when the internal air pressure has reached 3.5 psi guage, a stop watch or sweep second hand watch shall be used to determine the time lapse required for the air press~re to drop to 2.5 psi guage. If the time lapse required for the air pressure to decrease from 3.5to 2.5 psi exceeds that shown in the following table, the pipe shall be presumed to be within acceptalbe limits for leakage. If the time lapse is less than that shown in the table, the Contractor shall make the necessary corrections to reduce the leakage to acceptable limits. LINE INFORMATION TEST RESULTS AIR MANDREL ~ Time ~ Test ' Test Line Station ~ Pipe Diameter L.F. Tested Allowable PassedlPassed Inch L.F. A 0+54 ~ l+q~ R" 1~1, COG YES vR~ A 1+95 to 3+20 8" Inch 125, L.F. COG YES ¥~ Inch L.F. Inch L.F. Inch L.F. Inch L.F. Inch L.F. Inch L.F. Inch L.F. Inch L.F. Inch L.F Inch L.F. Inch L.F. Inch L.F. Inch L.F Inch L.F OWNERD~lekta Construction PROJECT NAME North Lake Industrial SEWER LINE LOCATION East & West of Bethel Rd TESTED BY Ron______~nie Doughty INSPECTOR Larry Davis DATE 11_7_89 JOB NO. ~7-~9-1~1 OF L~I/qE'~ON~[.2~AIC_..__ CITY OF- Coppell