Loading...
Northlake 635(2)-CS000825 (2)COPPELL TEXAS 75019 P.O. Box 478 CoppCL Texas 75019 972-462-0022 August 25, 2000 C. Jack Evans, P.E. Pacheco Koch 9401 LBJ Freeway, Suite 300 Dallas, Texas 75243 PSINet, Northlake 635 Business Park, Lot 1, Block A Final Acceptance Dear Mr. Evans: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Sincerely, Lanny Allison Construction Inspector CC: James Cofer, Tri Dal (fax: 817-481-8195) Ray Hubbard, Clark Technologies (fax: 972-745-2127) Mike Martin, Assistant City Engineer Debi Ingram, Engineering Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal