Northlake 635(2)-CS000825 (2)COPPELL TEXAS 75019
P.O. Box 478
CoppCL Texas 75019
972-462-0022
August 25, 2000
C. Jack Evans, P.E.
Pacheco Koch
9401 LBJ Freeway, Suite 300
Dallas, Texas 75243
PSINet, Northlake 635 Business Park, Lot 1, Block A
Final Acceptance
Dear Mr. Evans:
A final inspection of paving and utilities for the referenced project has been confirmed by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.
Sincerely,
Lanny Allison
Construction Inspector
CC:
James Cofer, Tri Dal (fax: 817-481-8195)
Ray Hubbard, Clark Technologies (fax: 972-745-2127)
Mike Martin, Assistant City Engineer
Debi Ingram, Engineering Secretary
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal